BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Carnation, Washington. Completed plans call for site work for a bridge / tunnel.

Langlois Creek Culvert Replacements (SVT and PSE Crossings) to all qualified bidders. (range $550,000 to $750,000) Major Bid Items include Mobilization; Structure Excavation Class A; Receival, Offload, Movement, and Installation of two (2) Precast Concrete Box Culverts (heaviest pick weight approximately 51,000 lbs.); Utility Coordination; Utility Work; Gravel Borrow; Streambed Sediment and Cobble; Crushed Surfacing Base Course; Temporary Stream Diversion; Groundwater Dewatering; Instream Large Wood Habitat Structures; Erosion Control and Pollution Prevention; Restoration Seeding and Planting; and other items in conformance with the 2024 WSDOT Standard Specifications, the Plans, and Specifications. The SVWID will supply the two new precast concrete box culverts (Culvert #1 - 18 X 10 X 70 and Culvert #2 - 18 x 10 x 20). The contractor is responsible for coordinating the transport of the culvert pieces to the project location. The in-water work for this project must be completed before the end of the fish window; September 30, 2024. The footprint of the project is within parcels owned by King County Parks, Puget Sound Energy, and Remlinger Farms, and includes major utilities such as overhead transmission lines and an underground cross-country AT&T fiberoptic cable. The contractor will be responsible for coordinating work with the AT&T contractor responsible for the fiberoptic Protect in Place Plan. Respectful and effective communication is essential. Knowledge and experience with water pumps, bypass setup, and dewatering wells is critical. Respect for aquatic animal species and an understanding of the removal and relocation best management practices is highly sought due to the high numbers of coho salmon in Langlois Creek. All aquatic animals will be removed by the SVWIDs consultant. Please contact Andy Obst, SVWID Program Manager, at andy@svwid.com or (425) 736-3782 with any questions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$872,343.00

Public - City

Site Work

12

11

36

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
50
Bidding Soon
913
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2024

August 5, 2024

img_map_placeholder

To Be Determined, Carnation, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.