BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Carnation, Washington. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Carnation requests sealed bid proposals for construction of the Tolt Middle School Sidewalk Improvements. Improvements along Tolt Avenue, in front of Tolt Middle School, include removal of trees, HMA sidewalk, and curb ramps, and reinstallation of cement conc. sidewalk, curb and gutter, tree installation, storm conveyance revisions, restoration and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The engineer's construction estimate range for this Project is $140,000 to $180,000. Tune for project completed shall be in accordance with Section 1-08.5 of the Standard Specification and as amended by the Special Provisions All bod proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent. (5%) of the amount of such bid proposal. Should the successful hid der fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the contract documented, the had proposal deposit shall be fur feited to the City of Carnation. No bidder may withdraw their bud proposal after the time fixed for opening thereof of before award of the contract, unless said award is delayed for a period exceeding thirty (30) days. The City of Carnation reserves the right to reject any or all bide, and to waive minor irregularities in the ladding process. Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall request in writing by the close of business five (5) business days preceding the bid opening. Oral explanations, interpretations, or instructions given by anyone before the Award of Contract will not be binding on the City of Carnation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$170,284.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
29
Bidding Soon
906
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

3740 Tolt Ave, Carnation, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.