BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2024 at 8:00 PM

Updated July 28, 2024

Site work for a water / sewer project in Darby, Montana. Completed plans call for site work for a water / sewer project.

The United States Forest Service has a need for the Bitterroot Rombo Campground Shoreline Stabilization project located in the Bitterroot National Forest. Period of Performance: 09/20/2024 to 11/15/2024 PROJECT LOCATION To reach the project area from Darby, MT: Drive south on US 93 approximately 4.1 miles, Turn right on State Hwy 473 (West Fork Road). Drive approximately 17.9 miles, turn right into the Rombo Campground and the project location is approximately 0.25 miles ahead. C.3 MAGNITUDE OF CONSTRUCTION PROJECT The Magnitude of Construction for this project is Between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description of Work This project consists of the shoreline stabilization of the West Fork Bitterroot River near the Rombo Campground. Work will include but is not limited to, erosion control measures, excavation, temporary river diversion, bio-engineered stabilization, large woody structure assembly and all other work items necessary to complete the projects in accordance with the plans and specifications.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Site Work

12

11

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
5
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

August 7, 2024

Project location map

To Be Determined, Darby, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.