Site work and paving for a road / highway in Guilford, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The location is on Town Highway 4, known as Weatherhead Hollow Road, from approximately the intersection of Timme Drive, heading south to the Massachusetts state line and is approximately 1.5 miles long. The ending location may be adjusted based on the awarded price per ton cost as each project has a monetary limit. The project consists of milled and tapered starting and stopping points and ending project tapers, (a full-width shim of 1 inch and an overlay with 1 inch of 50 Gyration Superpave mix design with 70-28 PG binder) of full virgin material mix. The Contractor must use a 2021 VTrans approved mix design for 50 Gyration Superpave mix design with 70-28 PG binder and the mix shall contain no recycled asphalt shingles (RAS), and no recycled asphalt pavement (RAP). It must be 100% virgin mix. The plant producing the bituminous concrete pavement shall have a current (2019) certification by the VTrans Construction & Materials Lab 72 hours prior to producing mix for the specified project(s). The Contractor must provide a paver which includes one operator and two screed persons. See section 406.10 of 2018 Spec book. The Contractor must provide compaction equipment and operators capable of attaining a compacted density of at least 92.5% maximum specific gravity of the mix. The Contractor will supply RS-1 or RS-1H Emulsion and distributor meeting sections 404.04 to 404.06 of 2018 Spec book for applying emulsion at a min. rate of 0.040 gal/SY. Emulsion is to be applied to all surfaces in contact with the new BCP. Cold longitudinal joints shall receive a double application of emulsion. Tack wagons not capable of applying a continuous uniform application at the specified rate of tack in a single pass will be removed from the project if the issue cannot be corrected. Emulsion shall be considered incidental to the work required for this contract and as such shall not be priced out separately but instead be included in the unit price of asphalt to be placed. The Contractor will provide equipment, operator and laborers necessary to cold plane 10 foot (minimum) tapers at project beginning and end limits, beginning and end approaches to bridges, side road tapers, to attain curb reveal, etc. May be done with a skid steer or bobcat with a milling attachment. The Contractor shall be responsible for all cleaning of the road surface(s) prior to paving. Paving to include 2 foot drive aprons and 2 foot side road aprons as required; this does not include any taper needed to match existing pavement. Excavation of material or fill material is to be included in the price per ton bid. The cleaning of haul units and paving equipment on the surface to be paved shall not be allowed. The contractor is responsible for locating on or off project(s) sites for this activity. All waste material generated from this activity shall be removed from the project(s) within 48 hours upon completion of the project at the sole expense of the contractor. The Contractor is expected to work within the Town right-of-way. Any cost associated with the contractor's desire to obtain clearances to work outside the existing right-of-way will be at the sole expense of the contractor. Damage by the contractor to Town and/or personal property, or utilities during construction will be repaired by the contractor to pre-construction condition and will be at the sole expense of the contractor. The Contractor is required to provide traffic control for the duration of the project(s). The Contractor for this work must possess valid and current licenses and certifications necessary to comply with the "Statement of Work", as listed below and as regulated by all applicable state and/or local laws and ordinances. The Provider must have prior training and experience in all aspects of municipal road resurfacing, with knowledge, skills, and understanding of the State of Vermont Agency of Transportation Road Standard Specifications for Construction 2018 and any additional revisions that follow. The Contractor shall warranty materials and workmanship for a period of one year from the date of completion. Defects and associated repair shall be reviewed with the Town prior to any remedial work. All remedial work shall be completed by the Contractor at no additional cost to the Town. By submitting a proposal, the Contractor certifies that, in accordance with the project's Additional Specifications, Project Documents, and the description of construction as shown above, I, or we, hereby certify that I am, or we are, the only person or persons interested in this Proposal as principal or principals; that it is made without collusion with any person, firm, or corporation; that an examination has been made of the Proposal, the provided documents, the Specifications and the site of the work, and that I, or we, propose to furnish all necessary machinery, equipment, tools, labor and other means of construction, and all materials specified, in the manner and at the time prescribed, understanding that the quantities of work as shown herein are only estimated and approximate and are subject to increase or decrease and that all quantities of work, whether increased or decreased, are to be performed at the unit prices listed in this proposal. Please provide a proposal for paving to Town of Guilford based on the information above and the information below. Proposals should provide the following additional information: Cover sheet with company name, address, year of establishment, contact information, and summary of the work that the company does. Please note on the cover sheet if you are a minority or women owned business enterprise as preference will be given to M/WBEs Experience in working with municipalities. List of all applicable licenses and certifications. Proof of general liability insurance with a minimum amount of $1,000,000 per occurrence. Proof of Workers Compensation Insurance. Submissions must include a full description of mix, unit of measure, estimated quantity (in number and words), unit price, and total bid price. Must be signed and dated by an authorizing company official. Project completion is to be no later than 30 September 2024. No paving will be completed after 15 October 2024 without prior written consent of Dan Zumbruski, Guilford Highway Commissioner. The Town of Guilford may consider any proposal not prepared and/or submitted in accordance with the provisions hereof as incomplete and will not be considered. The Town of Guilford reserves the right to reject any or all bids or to cancel the RFP at any time as best meets the needs and interests of the Town.

Award

Roads / Highways

$236,304.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
124
Bidding Soon
1,952
All Active Projects
898
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

Multiple Locations, Guilford, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.