Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Site work and paving for a mixed-use development in East Wenatchee, Washington. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The scope of work to be performed by the Consultant includes, but is not limited to, two (2) alternate I/S analyses, traffic analysis, geotechnical analysis, and civil design on the Grant Rd & Lyle Ave Intersection Improvements project. The proposed improvements include new curb, gutter, sidewalk, ADA ramps, illumination, intersection improvements, retaining walls, fencing, and storm water facilities. Additional services may be added-in future phases of the project. Questions regarding the project, solicitation and selection process should be directed to Jessie King, PE at (509) 884-7173, jking@co.douglas.wa.us. A DBE goal of zero (0) percent has been established for consultants on this project. The consultant is expected to begin work immediately upon contract approval with design complete by December 31,2026. The Board of County Commissioners shall reserve the right to reject any or all proposals and the right to waive any irregularities or information in any proposal, subject to the Laws of the State of Washington as pertaining to public works, as may be deemed in the best interest of the County. The method of Contractor Selection has not been Determined at this time.
Design
Roads / Highways
$400,000.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2027
N Lyle Ave & Grant Rd, East Wenatchee, WA
Related To This Project
East Wenatchee, WA
Bid Date: Jul 11 2024
East Wenatchee, WA
Bid Date: Aug 02 2024
East Wenatchee, WA
--
East Wenatchee, WA
Bid Date: Aug 02 2024
East Wenatchee, WA
--
East Wenatchee, WA
--
East Wenatchee, WA
Bid Date: Aug 07 2024
East Wenatchee, WA
--
East Wenatchee, WA
Bid Date: Jul 22 2024
East Wenatchee, WA
Bid Date: Jul 22 2024
East Wenatchee, WA
Bid Date: Jun 24 2024
East Wenatchee, WA
Bid Date: Jul 01 2024
East Wenatchee, WA
Bid Date: Jun 19 2024
East Wenatchee, WA
Bid Date: Jun 10 2024
East Wenatchee, WA
Bid Date: Jun 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
