EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a sidewalk / parking lot in Spring City, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

The Spring City Parking Lot Improvements Phase 3. The Work Includes but is Not Limited to All Labor Materials, Tools, Oversight, Permits, and Bonds, Required to Construct Block Retaining Walls, Curbing, a Small Parking Lot, Lighting, Rain Garden and Required Landscaping and Signage. The Work Indicated Will Be Funded in Part by the Chester County Department of Community Development With Partial Reimbursement Under the Chester County Community Revitalization Program (Crp). Bids Must Be Accompanied by a Bid Bond With a Corporate Surety Authorized to Do Business in Pennsylvania, in Accordance With the Project Specifications in the Amount of 10% of the Total Bid Amount. A Performance and Payment Bond in the Amount of 100% of the Contract Shall Be Furnished by the Successful Bidder as Detailed in the Instructions to Bidders. Prevailing Wage Rates Shall Apply. Questions May Be Submitted Through Online "messages/vendor Discussions" Tab on or Before 3:00 Pm on Thursday, July 11, 2024. Responses Will Be Provided via Online to All Registered Parties. Spring City Borough Reserves the Right to Accept or Reject Any or All Bids or Portions or to Waive Any Informalities in Bidding and to Withhold Award for a Period of Sixty Days.

Award

Sidewalks / Parking Lot

$395,583.00

Public - City

Outdoor Lighting, Site Work

16

16

21

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Roads, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
205
Bidding Soon
2,984
All Active Projects
1,392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

August 15, 2024

img_map_placeholder

To Be Determined, Spring City, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Spring City Parking Lot Improvements Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.