Site work and renovation of a civil project in Tamaqua, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A. Without intending to limit or restrict extent of work required under this Contract, Work to be performed comprises the following 1. Headworks Building a. Construction of a new headworks building to the North of the existing headworks that will include the following: 1) Two (2) new mechanical bar screens with washer/compactors for screenings. Motor-operated slide gates will allow both screens to operate during wet weather flows. A third channel with a manual bar rack will allow for bypass of the screens in the case that a screen is out for maintenance during wet weather flows. 2) A new vortex-style grit removal system with two (2) grit pumps pumping grit to a washer/classifier unit. A bypass around the grit unit will be provided. 3) New magnetic flow meter downstream of the grit unit measuring flow into the plant. 4) New CSO regulator with overflow weir leading to CSO Diversion Chamber. The height of the weir will be set to only overflow when the hydraulic capacity of the plant is exceeded. A new fiberglass scum baffle will prevent scum and floatables from being discharged to CSO No. 014. 5) New CSO Diversion Chamber with two (2) motor-operated plug valves to control wet weather-induced high flow discharges. The diversion chamber will first direct wet weather-induced bypass flows to Equalization Tanks / Aeration Tank Nos. 5 and 6 for equalization to reduce CSO discharges. Only after Aeration Tank Nos. 5 and 6 have reached their capacity will flow be discharged to CSO No. 014. 6) New refrigerated, flow-proportioned, automatic sampler for taking influent samples. 7) New Electrical Room for equipment control panels The Project consists of improvements to the wastewater treatment plant (WWTP) including a new headworks building, installation of a new flash mix tank, rehabilitation of the primary and secondary clarifiers and associated equipment, rehabilitation of the aeration tanks and associated equipment, conversion of two aeration tanks to swing equalization basins, replacement of aeration blowers, installation of a new magnesium hydroxide system, replacement of the chlorine gas system with sodium hypochlorite disinfection, repair and rehabilitation of the primary digester, construction of a new boiler building and digester gas handling equipment, demolition of the secondary digesters, refurbishment of the laboratory, replacement of the existing belt filter press with a dewatering screw press, upgrade of the plant electrical service, installation of a new SCADA system and various piping, and site work associated with the improvements. Question Deadline 08/12/2024 at 12:00 PM ET Each Bid shall be accompanied by a certified check, bank money order, or a Bid Bond in an amount not less than 10 percent of the Bid total, payable to Tamaqua Borough Authority in accordance with the Instructions to Bidders. The Owner reserves the right, at its option, to waive as an informality any, defects, errors, or omissions in any or all Bids; and to reject any or all Bids. Bid Result General Construction G.M. McCrossin Inc. $18,854,000 Electrical George J Hayden Inc dba Hayden Power Group $3,887,800 Mechanical O&M MULTI-TRADE, Inc $1,894,049

Bid Results

Water / Sewer

$24,635,849.00

Public - City

Renovation, Site Work

285

41

56

5

Subscribe For Documents

146 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Contaminated Site Material Removal, Underground Storage Tank Removal
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Sheathing, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Membrane Roofing, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Institutional Furniture, Laboratory Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Fan Coil Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Schedules for Electrical, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts, Slings, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
133
Bidding Soon
1,999
All Active Projects
919
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

December 2, 2024

img_map_placeholder

32 Sewer Plant Rd, Tamaqua, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.