Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2025 at 7:00 PM
Updated January 9, 2025
Site work for a civil project in Sikanni Chief, British Columbia. Working plans call for site work for a bridge / tunnel; and road / highway.
This is the Phase 2 solicitation following an Invitation to Qualify. Only qualified suppliers have been invited to bid. The work for this requirement is to rehabilitate bridge culvert no.3 at Km 384.7 of the Alaska Highway in British Columbia. General work to be performed under this contract: 1.Removal and disposal of existing culvert materials and end walls; 2.CSP Culvert Liner supply and installation; 3.Grouting between CSP culvert liner and existing culvert; 4.SWSP culvert supply and installation with trenchless methods under the Alaska Highway; 5.Extension of SWSP culvert to beyond highway clear zone 6.Substrate retaining plate installation in SWSP culvert 7.Cast-in-place Culvert Concrete Collar End Treatment for SWSP and CSP culverts (inlet only); 8.Channel Excavation; 9.Highway widening to accommodate new concrete roadside barriers and flare, including embankment fill, road structure fill, asphalt cutting and milling, and asphalt paving; 10.Supply and placement of embankment fill and granular materials; 11.Supply and Installation of concrete roadside barriers; 12.Gabion supply and installation at inlet and outlets; 13.Placement of stream substrate in SWSP inlet and outlet channel; 14.Hydraulic seeding of disturbed embankment; 15.Permanent sediment and erosion control devices To assist with bonding and insurance requirements, this project is estimated to cost approximately between $1,000,001.00 and $5,000,000.00 (GST included). Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity. Cancelled.
Final Planning
Bridges / Tunnels
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
April 1, 2025
Alaska Hwy, Sikanni Chief, BC
Related To This Project
Sikanni Chief, BC
Bid Date: Jul 07 2025
Sikanni Chief, BC
Bid Date: Aug 12 2025
Sikanni Chief, BC
Bid Date: Dec 11 2025
Sikanni Chief, BC
Bid Date: Apr 19 2022
Sikanni Chief, BC
Bid Date: Oct 11 2022
Qualicum Beach, BC
Bid Date: Aug 08 2024
Nelson, BC
Bid Date: Aug 15 2024
Cranbrook, BC
Bid Date: Aug 08 2024
Oliver, BC
Bid Date: Aug 29 2024
Kamloops, BC
--
Surrey, BC
--
Vancouver, BC
--
Vancouver, BC
--
Rossland, BC
Bid Date: Aug 15 2024
Abbotsford, BC
Bid Date: Jul 19 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
