BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in St Petersburg, Florida. Completed plans call for the renovation of a municipal facility.

The St Petersburg VARO has 355 existing motorized hurricane shutters that at the push of a button will raise or lower in a sequential order. The contractor shall provide all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, and transportation necessary for the completion of a project to correct deficiencies found during the most recent test of the hurricane shutters. The scope of the work includes but is not limited to the repair or replacement of twenty-four (24) non-performing motorized hurricane shutters covering 4' by 8' windows. The contractor shall perform maintenance on the twenty-four identified hurricane shutters, ensuring all shutters are responsive to master commands from the master controllers, which are operated by Metasys, a proprietary program of Johnson Controls Inc. Some shutters are capable of independent operation, but will require controls and/or electrical rework to be responsive to master commands. Contractor shall: a. Conduct field site survey to verify measurements, locations, and site conditions for twenty-four (24) non-performing motorized hurricane shutters at the VARO St. Petersburg, Florida. b. Repair twenty-four (24) existing non-performing motorized hurricane shutters, which may include replacing the shutter motor, relay, manual crank, and/or intermediate switch. c. Ensure twenty-four (24) repaired motorized hurricane shutters are tied into the existing building circuit grid (Metasys) so they raise and lower in sequential order (first floor shutters are exempt). d. Provide required lift to access windows as required. e. Clean and lubricate the twenty-four (24) shutters identified. f. Properly dispose of the old residual parts. g. Ensure construction area is free of trash and debris upon completion of this project. The contractor shall be responsible for fixing/repair any damages to the building or any landscaping which occurs because of operating the lift on site. Damaged items shall be returned to their original state or better. If required, Contractor shall coordinate with the system integrator involved in any new and additional component implementation to ensure that any project related warranty and contractual service on new hardware/software remains in force. Due to the hurricane season having begun in the region, shutter maintenance shall be conducted ASAP. Additional specifications for this requirement are detailed in the attached statement of work (SOW) which has been incorporated into the RFQ.

Post-Bid

Municipal

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
103
Bidding Soon
1,868
All Active Projects
728
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 30, 2024

August 1, 2024

August 31, 2024

img_map_placeholder

9500 Bay Pines Blvd, St Petersburg, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.