BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Fort Myers, Florida. Completed plans call for the renovation of a water / sewer project.

The City is seeking qualified contractors to reconstruct the surround area of Rachel at the Well, also known as The Spirit of Fort Myers at the entrance to the Edison Park neighborhood off McGregor Boulevard. Both Rachel and the surround were damaged during Hurricane Ian. Rachel herself has been restored but the surround remains damaged. City crews have removed the debris and salvaged two obelisks for use by the selected contractor in replicating for replacement. The work generally consists of the reconstruction of two columns by installing new structural superstructure on the existing decorative masonry bases; fabricating and installing new wrought iron decorative fence with finials on top of masonry wall to mimic damaged fence; rehabilitation of existing stucco including patching holes, cleaning, repairing cracks and painting; adding new lighting fixtures per provided light fixture schedule; replacing existing electrical panel; installing new receptacles; and installing new floratam sod and irrigation between arches and curb ramps. All construction shall be in accordance with the construction drawings, building permits and approvals from the City's Historic Preservation Council. Question Submission Deadline:October 28, 2024, 4:00pm Proposed City Council Approval Date:January 6, 2025 Reconstruct columns at the entrance to Edison Park. Install new structural superstructure on existing decorative masonry bases. Build and install new wrought iron decorative fence with finials on top of masonry wall. Rehabilitate existing stucco including patching holes, cleaning, repairing cracks and painting. Add new lighting fixtures per light fixture schedule. Replace exiting electrical panel, install new receptacles, and install new floratam sod and irrigation between arch and curb cut. Build according to attached construction drawings.

Post-Bid

Water / Sewer

$415,800.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
27
Bidding Soon
460
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

img_map_placeholder

McGregor Blvd, Fort Myers, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.