BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2024 at 8:00 PM

Updated October 19, 2024

Site work and paving for a road / highway in Liberal, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2025 Asphalt Overlay. Site Address: Multiple Sites. Question Deadline 09/08/2024 A BIDDER requiring clarification or interpretation of the CONTRACT DOCUMENTS shall make a written request to the ENGINEER, C.W. Harper at charper@kirkham.com. The OWNER or ENGINEER must receive the written request a minimum of two (2) calendar days prior to the date of the bid opening. Pre-Qualification: Yes The project consists of location 1: On Rd R, a 1" mill and 2" HMA overlay on, starting at the intersection with US-54, then proceeding west and north eight and nine tenth (8.9) miles to US-160. At location 2: On Meade Lake Rd, a 1.5" mill and 3" HMA overlay, starting at the intersection with US-54, then proceeding east five and one-half (5.5) miles to the Meade County line. At Location 3: On V Rd, a 1" mill and 2" HMA overlay, starting at the intersection with Meade Lake Rd, then proceeding north two and one-half (2.5) miles to US-54, and on Rd 16, starting at the intersection with T Rd, then proceeding east one and one-half (1.5) miles to the south end on the Kismet Main St curve. At location 4: On Kismet Main St, a 2" mill and 2" HMA overlay on Kismet Main St for the center 24' driving lanes, starting at the intersection with US-54, then proceeding north zero and six tenths (0.6) miles to the south end of the curve with Rd 16. Add alternate 1: At location 4: On Kismet Main St, a 2" mill and 2" HMA overlay on Kismet Main St for the outside 8'on both sides, starting at the intersection with US-54, then proceeding north zero and six tenths (0.6) miles to the south end of the curve with Rd 16. At location 5: On Rd J, a 1" mill and 2" HMA overlay on, starting at the intersection with Rd I, then proceeding north seven and one-half (7.5) miles to K-190. At location 6: On Larabee Rd, a 1" mill and 2" HMA overlay on, starting at the Oklahoma State Line, then proceeding north one and one-half (1.5) miles to US-160. Total length of all locations 28 miles, total working days 95, with an additional 5 working days for add alternate 1. Questions regarding bids shall be directed in writing to C.W. Harper, charper@kirkham.com a minimum of two (2) calendar days prior to the date of the bid opening.

Award

Roads / Highways

$5,856,041.00

Public - City

Paving, Site Work

3

9

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
86
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

March 3, 2025

Project location map

Multiple Locations, Liberal, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.