BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2024 at 8:00 PM

Updated November 1, 2024

Site work and paving for a civil project in Mill Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project Description: The work generally consists of mobilization, traffic control, implementing a water pollution control plan, repairing/stabilizing roadway storm damage by installing approximately 130 liner feet of retaining wall, and clean-up of the project area, and other items of work as shown on the plans The project is located roughly between 220 and 260 Monte Vista Avenue in the City of Mill Valley A Bid Bond in the amount of 10% of the total bid amount payable to the City of Mill Valley shall accompany the Proposal. Award of contract, if awarded, will be to the lowest responsible bidder whose proposal complies with prescribed requirements, and will be within thirty (30) days after receipt of proposals Telephones will not be available to bidders for the preparation of bids or for calling in bid results. Bid forms received after the designated time shall not be accepted. No bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening of bids. Award Contract 9/4/2024 Construction Start 9/16/2024 Construction Complete 10/14/2024 The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. Final Contractor Questions Due 8/21/2024 The proposed scope of work includes construction of a new soldier pile and timber lagging retaining wall to support a portion of Monte Vista Avenue between addresses 220 and 260, in the City of Mill Valley. As outlined in the schedule of bid items, this work includes, but is not limited to, mobilization, traffic control, implementing a water pollution control program, construction of a soldier pile timber lagging retaining wall, removing and replacing hot mix asphalt pavement, clean-up of the project area, and other items of work as shown on the Plans, as called for in the Special Provisions, and as directed by the Engineer.

Award

Roads / Highways

$233,415.00

Public - City

Paving, Site Work

8

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
257
Bidding Soon
2,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 16, 2024

Project location map

Monte Vista Ave, Mill Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.