Site work and paving for a civil project in McDonald, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Connecticut Ave Resurfacing The project will consist of full depth reconstruction on the edges of the roadway section, installation of underdrain and connection to the existing storm sewer, and 2.0" of resurfacing to correct failures throughout the system on Connecticut Avenue (New Jersey Avenue to E. 7th Street). The work includes the reconstruction of existing roadway cross-slope to improve drainage characteristics along with the adjustment or reconstruction of the existing catch basins. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each Proposal must state full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed in 30 calendar days from the notice to proceed. BID GUARANTY AND BONDS A Bid Guarantee Bond, a Contract Bond (Performance Bond), a Payment Bond and Maintenance Bond (Maintenance Bond shall be for 100% of the final Contract Amount) will be required by the Village. LIQUIDATED DAMAGES If, due to misconduct or neglect, the contractor fails to complete the contract on or before the completion dates specified in the proposal, the contractor agrees that each day the contract shall remain uncompleted after the dates, the owner may deduct the sum of five-hundred dollars ($500) per diem from the contract price. It is understood by the contractor and the owner that actual damages caused by failure of the contractor to complete this contract on time are impracticable or extremely difficult to evaluate and fix and that the per diem deduction from the contract price shall be retained by the owner as payment by the contractor of liquidated damages, and not as a penalty, for such failure.

Award

Water / Sewer

$157,489.00

Public - City

Paving, Site Work

10

9

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
92
Bidding Soon
1,129
All Active Projects
447
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

Connecticut Ave, McDonald, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.