Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
Site work, paving and new construction of a mixed-use development in Forest Park, Georgia. Completed plans call for the construction of a 122,266-square-foot, three-story above grade fire / police facility; for site work for a fire / police facility; for paving for a fire / police facility; 97,158-square-foot, three-story above grade municipal facility; municipal facility; and fitness / recreation center.
Carroll Daniel Construction is the awarded Construction Manager (CM) for the Forest Park City Center project. We are soliciting pricing for the construction of the project. This project includes a 3-story (122,266 SF) Administration Building inclusive of Police Headquarters and City Hall Municipalities, a 3-story (97,158 SF) Recreation Building with Structured Parking below the buildings. The 100% Design Development documents include partial specifications, building floor plans, building elevations, & interior views. Please reference the drawings for trades that may not have a specification at this time. Bid Packages including Bid Forms & Project Scopes will be provided at a later date (TBD). This project will be a part of a CCIP Program. (Contractor Controlled Insurance Program). Literature pertaining to this program will be submitted at a later date (TBD). *The original solicitation is listed below for historical reference. Question Submission Deadline: August 28, 2024, 5:00pm Refer to the attached Schematic Design Report dated July 15, 2024, as a reference point in compiling proposals. The CMAR will be responsible for developing the detailed schedule and coordinating activities to accomplish the scheduled completion of the project. The CMAR will be responsible for pricing, value engineering, and maintainability and constructability issues. When the design documents for the project have been developed in sufficient detail, the CMAR, with the support and assistance of the Architect, will commit to a Guaranteed Maximum Price (GMP) for all construction and site development. If the City requests multiple bid packages, construction will commence with the issuance of the first bid package while remaining bid packages are being finalized. The CMAR shall competitively select construction subcontracts and other work appropriate for competitive selection using cost and other factors. The successful CMAR may perform work with their own forces but shall not be eligible to enter into contract or subcontract for any of the construction or other services of any nature on the project without the specific approval of the City. In selecting a firm, the City will place emphasis on experience of the firm and assigned personnel in CMAR contracts for large government administration, justice and public safety facilities. Emphasis will also be placed on firms having depth, knowledge, and resources in principles of contracting, scheduling, contract coordination and compliance, budget control, familiarity with State and local laws, ordinances and codes as demonstrated by prior experience, and strategies for encouraged participation by local companies and laborers. The Construction Manager at Risk (CMAR) will be under contract to supply pre-construction services and subsequently, by change order, construction services (under the AIA A133 agreement) to complete the project and place the Owner in occupancy of the project in a "turnkey" fashion. The Owner has contracted with the Architect separately from the CMAR. Once a Guaranteed Maximum Price (GMP) is agreed upon between the Owner and the CMAR, the CMAR may be issued a change order for the amount of the GMP and will be "at risk" for project price, project schedule, and completion of all construction as set forth in the Contract Documents. The CMAR shall hold all trade contracts and trade supplier contracts.
Post-Bid
Fire / Police
$5,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 12, 2026
803 Forest Pkwy, Forest Park, GA
Related To This Project
Forest Park, GA
Bid Date: Apr 22 2025
Forest Park, GA
Bid Date: Nov 15 2024
Forest Park, GA
Bid Date: Dec 04 2024
Forest Park, GA
Bid Date: Feb 04 2025
Forest Park, GA
Bid Date: Jan 08 2025
Forest Park, GA
Bid Date: Feb 04 2025
Forest Park, GA
Bid Date: Jan 15 2025
Forest Park, GA
--
Forest Park, GA
Bid Date: Aug 07 2024
Forest Park, GA
--
Forest Park, GA
Bid Date: Jul 30 2024
Forest Park, GA
Bid Date: Jul 08 2024
Forest Park, GA
Bid Date: Jul 11 2024
Forest Park, GA
Bid Date: Jun 12 2024
Forest Park, GA
Bid Date: May 15 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.