BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Forest Park, Georgia. Completed plans call for the renovation of a clubhouse / community center.

**As of September 9, 2024 , this project has not yet been awarded. A timeline for award has not yet been established. City of Forest Park, Georgia is requesting quotes from qualified contractors for flooring replacement located at the Community Center at 696 Main Street, Forest Park, Georgia. This will involve the removal of the existing flooring (carpet and tile) and the installation of new tile flooring. The color of the new tile and grout will be like the sample tile flooring in Attachment E and the base boards will match the existing columns color. The work will include, but is not limited to, the removal of all the old carpet and/ or tiles and the installation of new tile located in the Community center on the 1st floor. The Contractor shall provide materials, equipment, and labor necessary to perform the flooring replacement work defined in the Specifications below: Contractor is responsible for taking necessary measurements during the site visit. Contractor is responsible for securing all necessary permits from the City. Remove and replace carpet with tile flooring and base boards. Provide safety measures and secure the work area during the time work is being performed. All the work performed must be in compliance with local standard codes and all other federal, state, and local regulations in reference to construction renovations. Work shall be performed with minimum disruption during City working hours of 8:00 AM to 5:00 PM. Contractor is responsible for cleaning up the work site, hauling away trash and debris, and demobilizing work forces. Contractor must provide an itemized description list for each line item that is included in the quote price schedule. All questions are due on or before 5:00 pmon Tuesday, June 25, 2024 QA to Talisa Clark, Purchasing Officer by email to tclark@forestparkga.gov. Proposed Term: Thirty (30) calendar days

Bid Results

Clubhouse / Community Centers

$29,167.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
56
Bidding Soon
1,542
All Active Projects
707
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

696 Main St, Forest Park, GA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.