Site work and paving for a mixed-use development in Norton Shores, Michigan. Completed plans call for site work for a bridge / tunnel; bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of August 30, 2024 this project was awarded to Weick Bros., Inc. in the amount of $1,694,040.70. The City of Norton Shores is seeking sealed bids for the Lake Harbor Trail Project. The work will include approximately 2.8 miles of Hot-Mix Asphalt (HMA) trail construction along the west side of Lake Harbor Road between Lake Harbor Park and Henry Street including retaining wall construction, tree removal, ADA ramps, culvert extension, spot concrete curb and gutter, traffic control, restoration, and all related work. Construction shall be per the Michigan Department of Transportation 2020 Standard Specifications for Construction, EGLE and County Permits, the DNR Operating Agreement for work within the State Park, and attached specifications. The Contractor may begin the work once a Notice to Proceed has been issued. Work shall be done in two phases. Phase 1 will complete the trail between the Point of Beginning (Lake Harbor Park Driveway) to Sternberg Road by November 15, 2024. Phase 2 will complete the installation of the trail between Sternberg Road and Henry Street with final restoration by June 30, 2025. All tree removals within the State Park will be within the time frame permitted by the DNR Operating Agreement. A certified check, bank draft, or bid bond in the sum of not less than five percent (5%) of the amount of the proposal will be required with each bid. The City will award the project in a manner determined to be in the best interest of the City. The City reserves the right to reject any and all bids in the best interest of the City. Phase 2 will complete the installation of the trail between Sternberg Road and Henry Street with final restoration by July 31, 2025 or within 18 weeks from the start of construction, not including seasonal shutdowns whichever is sooner.

Award

Roads / Highways

$1,694,041.00

Public - City

Paving, Site Work

19

5

4

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
30
Bidding Soon
406
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

img_map_placeholder

Lake Harbor Rd, Norton Shores, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.