EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 4, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Telluride, Colorado. Working plans call for the renovation of a municipal facility.

As of October 4, 2024 project is cancelled. San Miguel County ("City") is requesting proposals from qualified professional mechanical systems engineering, plumbing and installation firms to provide designbuild services associated with the replacement of the heating, ventilation system ("HVAC") for the Miramonte Building located at 333 W. Colorado Ave. in Telluride, Colorado. The building is a three-story building located in Telluride. The County has had multiple callouts for HVAC repairs, and has experienced boiler failure during cold weather which has been disruptive currently and over the past years. Most recently, one of the two redundant boilers has completely failed with a rupture in the heat exchanger precipitating additional urgency for improving the overall system as expediently as is possible. The facility had been identified as needing replacement to advance the greenhouse gas emissions goals of the county, however initial space analysis included in this RFP have suggested a short-term solution then a long term redesign. This request for proposals is intended to meet the short term and redundancy needs of the facility moving forward with added additional aspects for better controls depending on the costs to complete the critical scope of work. At the time of the execution of this Contract, the Contractor shall furnish a Contract Payment Bond and a Contract Performance Bond. Each bond shall be in the penal sum equal to the nearest integral one hundred dollars in excess of the Contract value or amount, plus all force account items, if any, specified in the project special conditions to be included in the payment and performance bonds. The bonds and the security shall be acceptable to the County Inquiries on the contents and requirements of the RFP will be accepted in written electronic form only. Inquiries can be emailed to the attention of: Jarrod Biggs to jarrodb@sanmiguelcountyco.gov. The deadline for inquiries is Monday, August 26 2023 at 3:00 PM Mountain Time, after which time no further inquiries will be addressed

Final Planning

Municipal

$300,000.00

Public - County

Renovation

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
11
Bidding Soon
68
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

April 4, 2025

img_map_placeholder

333 W Colorado Ave, Telluride, CO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Miramonte Building Design-build Replacement of HVAC Heating Systems

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.