BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lincoln Park, Michigan. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000362102 The City of Lincoln Park is accepting sealed bids from Contractors. The proposed project consists of water main replacement of McClain, Mill, Cleveland, Lincoln, Garfield, Philomene, Cleophus Avenues from West of Howard Street to Fort Park Blvd., and Fort Park Blvd. from Champaign to Cleophus Ave. The water main replacement work will consist of approximately 13,100 feet of 8-inch HDPE Direction Drill, 1,750 feet of 8-inch HDPE Pipe Bursting and 2761 feet of 8-inch D.I Water Main Open Cut and including thirty eight (38) new Fire Hydrants, seventeen (17) of 8-inch Gate Valve & Wells, sixteen (16) of 8-inch Gate Valve and D-Boxes, one (1) 8-inch tapping sleeve and well, (587) Water Service Replacement from the new water main to the curb stop (city side only) and (164) Lead Water Service Replacement from the water main to the meter 18-inch inside the buildings. The work involves removal and replacement sections of roads, sidewalks, and driveways to complete the work. The anticipated start date weather permitting no later than April 1st, 2025, and substantially completed by September 1st, 2025, with restoration and final completion by September 29, 2025. Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. **The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the date of bid opened. All questions relating to the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing. Replies, if any, may be issued if ENGINEER decides it to be in the interest of the project, by addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. ENGINEER reserves the right not to answer questions received less than 10 days prior to the date for opening of bids.

Award

Water / Sewer

$6,123,001.00

Public - City

Paving, Site Work

106

7

2

5

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
78
Bidding Soon
1,473
All Active Projects
668
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

April 1, 2025

img_map_placeholder

Multiple Locations, Lincoln Park, MI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.