BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Streamwood, Illinois. Conceptual plans call for the addition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for the demolition of a educational facility.

Cost recommendations for four new or expanded/renovated elementary schools were presented to the U-46 School Board Monday, all of which keep within the $380 million parameter set for the district’s overall facilities improvement plan. Plans as of now: Renovation work and an expansion added to Glenbrook Elementary in Streamwood will cost about $30 million. Construction will be done during summer 2025 and 2026 so the buildings can remain in use during the school year. Architectural plans for the building could be ready for presentation in September with board approval. The Unite U-46 facilities master plan was unveiled a few years ago, and voters signed off on an $179 million bond sale in April 2023 to partially fund new construction and improvements estimated to cost up to $380 million. The rest of the funding will come from district reserve money. A timetable for when work on the elementary school will be begin and end is to be revealed at the School Board’s Sept. 23 meeting, where information on boundary changes also will be discussed. Staff plans to meet with parents and residents in late September about elementary school boundary changes, and subsequent meetings in the fall will outline plans for high school boundary changes. The school district plans to bring boundary recommendations to the board in the early- to mid-spring of 2025 to provide well over a year’s notice to families. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Educational

$30,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
104
Bidding Soon
2,044
All Active Projects
925
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

img_map_placeholder

315 Garden Cir, Streamwood, IL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.