BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Site work for a water / sewer project in Westfield, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Project includes the following Work Cured-in-Place Pipe Lining of approximately 2,250 linear feet of 6" diameter Vitrified Clay Pipe (VCP). Lining of laterals connected to sewer to be lined and installation of vacuum excavated cleanouts for each lined lateral. Lining and rehabilitation of six (6) manholes. Church Street Sewer Rehab Cured-in-Place Pipe Lining of approximately 2,250 linear feet of 6" diameter Vitrified Clay Pipe (VCP). Lining of laterals connected to sewer to be lined and installation of vacuum excavated cleanouts for each lined lateral. Lining and rehabilitation of six (6) brick manholes. Question Deadline 10/18/2024 at 4:00 PM ET Location : online portal . Questions regarding this project shall be submitted electronically Responses to questions which require changes to the Bidding Documents will be issued by Addenda posted within online. Each bid shall be accompanied by a certified check or bid bond in the amount of 10 percent (10%) of the maximum amount of the bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Other Requirements Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. A Performance and Payment Bond, each in the amount of one hundred percent (100%) of the estimated contract price, shall be required from the Successful Bidder. The Supplementary Conditions set forth requirements for the payment by the Contractor and all Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the PA Prevailing Wage Act, and the Bid shall be prepared accordingly. All Iron and Steel products must meet PA Steel Procurement Act Requirements Westfield Borough reserves the right to waive any irregularities and to reject any and all bids and to award the contract to the lowest responsible bidder for the total of all lump sum items. Proposals may be withdrawn, altered or otherwise modified within PennBid at any time prior to the due date and time indicated above. No bidder may withdraw his or her bid within sixty (60) days after the actual opening thereof. Contract No. 1 - General Construction

Award

Water / Sewer

$650,548.00

Public - City

Site Work

26

19

4

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
5
Bidding Soon
1,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2024

November 25, 2024

Project location map

Church St, Westfield, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.