Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Suisun City, California. Conceptual plans call for site work for a water / sewer project.
The City of Suisun City is inviting highly qualified professional consulting firms to provide proposals for professional services to prepare plans, specifications and cost estimates (PS&E) for the 2025 Sewer Rehabilitation Project. Neither the issuance of this RFP nor the acceptance of Proposals commits the City to award or enter into an Agreement. The City reserves the unfettered right to reject any or all Proposals, at any time, and to seek new Proposals when in the best interest of the City. The City also reserves the right to cancel, modify, or postpone this RFP or the Project, at any time, and to waive any irregularities or informalities in any RFP procedures. Each Proposer is solely responsible for the expenses it incurs in responding to this RFP. The City expressly disclaims responsibility for any assumptions a Proposer might draw from the presence or absence of information provided by the City in any form. City of Suisun City in conjunction with the Fairfield Suisun Sewer District (FSSD) operate and maintain the wastewater collection system that serves the City. Suisun City owns and operates sewer mains up to 10 inches in diameter while FSSD owns and operates sewer mains or trunks greater than 10 inches, pump stations, siphons and force mains in the City's wastewater collection system. The City's gravity sewer consists of approximately 58 miles; the mains are ageing and beginning to fail. design of the 2025 Sewer Rehabilitation project involves the analysis of sewer CCTV data for developing a construction bid package for system rehabilitation in the area outlined in Attachment A. Although the project scope does not include the rehabilitation of service laterals, it will involve evaluating the connections to the mains whenever feasible. Additionally, recommendations for addressing any identified connection deficiencies will be provided by as necessary. For background, while service lateral rehabilitation is not part of the annual project scope. the City is responsible for maintaining the lateral segment that extends from a permitted street-side cleanout, typically located one to two and a half feet behind the sidewalk. If there is no permitted street-side cleanout, or if the cleanout is unauthorized by the City, the maintenance responsibility falls to the adjacent property owner. It the responsibility of the Consultant to check the City's website for issuance of addendum or clarification related to the RFP. Questions submitted after 12 noon on October 7, 2024, may not receive a response prior to proposal opening, unless subsequently modified by the City by addendum. Questions or requests for clarification for this Project may only be submitted in writing. to at Maribel De La Cruz, Associate Engineer/Project Manager, mdelacruz@suisun.com. Also, copy Gemma Geluz at ggeluz@suisun.com. No oral statements by any City employee or representative will be binding against the City. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
Multiple Locations, Suisun City, CA
Related To This Project
Suisun City, CA
Bid Date: Oct 23 2024
Suisun City, CA
Bid Date: Oct 24 2024
Suisun City, CA
Bid Date: Oct 22 2024
Suisun City, CA
Bid Date: Oct 02 2024
Suisun City, CA
Bid Date: Sep 25 2024
Suisun City, CA
Bid Date: May 29 2024
Suisun City, CA
Bid Date: Jan 09 2025
Suisun City, CA
Bid Date: May 22 2024
Suisun City, CA
--
Suisun City, CA
Bid Date: Jul 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.