Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Site work and paving for a mixed-use development in West Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and water / sewer project.

Construction of 3900 feet of EP True Parkway from Grand Prairie Parkway to Future Bridgewood Boulevard including 29 acres of Clearing and Grubbing, 27,927 CY of Topsoil Strip, Salvage and Spread, 118,100 CY of Excavation. 4,838 LF of Storm Sewer and 52 Storm Sewer Structures. 5,410 LF of Subdrain and Subdrain Outlets. 20,440 LF of Conduit and Vaults. 4,057 LF of Water Main, Fittings, Valves and Hydrants. 28,914 SY of 8.5 inch Reinforced PCC Pavement, 4,283 SY of 6 inch Reinforced PCC Shared Use Path and 425 SY of 6 inch PCC Driveway. Erosion Control, Seeding and Surface Restoration, Pavement Markings, Construction Survey, and other Miscellaneous Construction. The second phase of EP True Parkway from Bridgewood Boulevard to Wendover Lane is scheduled to be let in late May, 2025. Intersection improvements at EP True Parkway and Grand Prairie Parkway is scheduled to be let in late May, 2025. This project will require coordination with both of these projects. by a scanned copy of the bid bond or a scanned copy of a cashier's or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk's Office by the apparent low bidder within 48 hours of the bid deadline. The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of four (4) years from the time of acceptance by the City. Work on said project shall commence within 10 days of written notice to proceed and shall be completed by August 15th, 2026. Liquidated damages in the amount of Five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project. Questions concerning interpretation or intent of the Contract Documents should be directed to: Thomas Stovie, P.E. McClure Engineering 1360 NW 121st Street, Suite A Clive, IA 50325 (515) 964-1229

Award

Roads / Highways

$5,066,656.00

Public - City

Paving, Site Work

144

8

2

5

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
95
Bidding Soon
1,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

July 7, 2025

Project location map

EP True Pkwy, West Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.