BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Reno, Nevada. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

License Requirements Contractor License, City of Reno Business License Liquidated Damages $1,000 Estimated Bid Value $1.1-1.3mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Duration 65 working days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/23/2024 5:00 PM (PDT) Contact Info Joseph Cashman / 775-433-4627 cashmanj@reno.gov. Lighting upgrades along the Truckee River Path from Booth Street to Fisherman's Park. Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals necessary to complete the work in the manner and time prescribed, and in strict conformity with the Contract Documents to the satisfaction of the City Engineer. In general, the major work items include: Lighting upgrades along the Truckee River Path from Booth Street to Fisherman's Park. Minority and Women Business Enterprises will be afforded full opportunity to submit bids in response to this notice, and will not be discriminated against on the grounds of race, color, or national origin in consideration for and award of any contract entered into pursuant to this advertisement. The City of Reno affirms its interest in and encourages the different contracting communities to actively pursue participation and utilization of Minority and Women Business Enterprises on City projects. The proposed contract is under and subject to Executive Order 11246 of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Labor Standard Provisions. Minimum Wage rates have been determined by the Labor Commissioner of the State of Nevada and are set forth in the contract documents. In no case shall the wage rates be less than prescribed therein. In the event there is a difference between the minimum wage rates as predetermined by the Secretary of Labor and the prevailing wages rates as determined by the State Labor Commissioner for similar classifications of labor, the contractor or and his subcontractor shall not pay less than the wage rate which is the higher of the two. The bidder must supply all the information required by the bid documents and specifications and complete all forms in the Proposal, including, but not limited to the Suspension and Debarment Certificate, Prime Contractors Agreement of Compliance, and Bidders Statement on Previous Contracts Subject to EEO Clause. The EEO requirements, labor provisions, and wage rates are included in the specifications and bid documents. The Bidders attention is directed to Nevada Revised Statutes 338.01165 setting forth the requirements for the use of apprentices on public works which requires a contractor or subcontractor to comply with certain requirements relating to the use of apprentices on public works. All Proposals shall be subject to, and must be uploaded using the City of Reno Proposal Forms provided in the Contract Documents. Failure to submit the Proposal on the forms or without all forms in the Proposal completed will be grounds for the Proposal being rejected. Some errors in printing have been observed from contractors printing from Apple or Mac computers. Please check your documents to ensure that documents are displaying correctly prior to submittal. All bidders shall appear on the official prospective bidders list. The City reserves the right to reject any or all Proposals. The attention of Bidders is directed to the State Contractor's License Law (NRS Provision 624.700 as amended to date). A certified check, cashier's check, bid bond or cash, in the amount of five percent (5%) of the total bid must accompany each Proposal, as a guarantee that if awarded the Contract, the Bidder will execute the Contract, give the two (2) bonds required, and present evidence of the required liability insurance and being licensed under the provisions Chapter 4.04 of the Reno Municipal Code. Said check shall be made payable to the City of Reno, and said bond shall be executed by an approved surety, if used. The provision of any such bond, check, or cash is conditioned to the effect that should the Bidder to whom the Contract is awarded fail to enter into the Contract in accordance with the Proposal, give the two (2) bonds required by said Contract, present sufficient evidence of required liability insurance and being licensed under the provisions of Chapter 4.04 of the Reno Municipal Code within ten (10) calendar days after notice of such award, the surety company shall forthwith pay the City of Reno the sum set forth in the bid bond, and the City shall be entitled to deposit the cash or check as liquidated damages. The Bidder's attention is especially directed to NRS 338.125, NRS 338.130 and NRS 613.250. For projects which are estimated to exceed $2.5 million in accordance with the engineer's estimate, Bidders must be prequalified pursuant to NRS 338.1382(1)(a) to bid on the project. Bidders at the time of submission of the bid must be qualified by the State of Nevada Public Works Board and be on the State Public Works Board Qualified Bidder List. A bidder not prequalified is not an eligible bidder. In order to claim the benefits of NRS 338.147 or 338.1389, the bidder must attach a Certificate of Eligibility at the time of the proposal submittal and complete and submit the Affidavit Regarding Preference in bidding within 2 hours after completion of the opening of the bids. Contractors who appear on the Nevada State Office of the Labor Commissioner's Disqualified Contractor list or the Federal Government General Services Administration (GSA) System for Award Management (SAM) with an exclusion will not be eligible for award of the contract. Bidders shall hold a valid State of Nevada Contractor's License of a class corresponding to the work to be performed at the time the Proposal is submitted to the City of Reno. Failure to possess the appropriate contractor's license at the time the Proposal is submitted will result in the Proposal being rejected. The successful Bidder must possess a valid City of Reno Business License prior to the award of any Contract. RMC 4.04.020 applies to subcontractors as to Business License requirements. NRS 338.072 provides that any subcontractor of the successful bidder who is awarded the contract must also hold a state business license issued pursuant to Chapter 76 of the Nevada Revised Statutes.

Sub-Bidding

Roads / Highways

$1,300,000.00

Public - City

Outdoor Lighting, Site Work

21

5

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
298
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 16, 2024

img_map_placeholder

Truckee River Trail, Reno, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.