BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Framingham, Massachusetts. Conceptual plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The design of the roadway, drains, curbs, and sidewalks along the full Central Street corridor follows the already completed water and sewer improvement design. This projects roadway design will consist of pavement profiles and sub-base assessments, modifications to road surfacing and geometry, and upgrades to meet ADA sidewalk, ramp, and curb requirements. The work will include review and identification of right-of-way needs and preparation of easement plans for as many as ten properties. Approximately 5,050 LF of drain will be television inspected and assessed, and as many as 10,600 LF of drain will be considered for trenchless rehabilitation. Up to ten stormwater outfall locations will be located, mapped, and assessed. A sidewalk accessibility study, Central Street is a priority corridor for improvement to all infrastructure. The water and sewer designs have been completed to the 90% milestone, but no design work has been undertaken yet for drains, roadways, sidewalks, and curbs. This proposed project will include sub-base assessments and the design of pavement profiles, modifications to road surfacing and geometry, and upgrades to meet ADA sidewalk, ramp, and curb requirements. Sections of the drain are known to be in poor condition and require rehabilitation. A drainage assessment will feature television inspection of over 5,000 feet of storm sewer, a feasibility analysis for rehabilitating as much as 10,600 feet of drainage using trenchless technologies, and locating, mapping, and assessing up to ten stormwater outfall locations. Sidewalk design will build upon a completed sidewalk accessibility study and road and sidewalk condition assessment, which found that improvements are needed to meet the latest ADA requirements. Construction will be phased such that the water, sewer, and drain work will be completed first, followed by roads, curbs, and sidewalk improvements. Addressing buried infrastructure at one time prior to the surficial features will minimize the overall disruption to the neighborhood and those who use the corridor for commuting. As of October 28, 2024, This project is included in the city's 2025-2034 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$9,430,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
218
Bidding Soon
3,079
All Active Projects
1,372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

img_map_placeholder

Central St, Framingham, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.