EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 23, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Bellingham, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The improvement consists of: This Contract provides for the improvement of the 12th Street and Finnegan Way Corridor with a flashing crosswalk at 12th/McKenzie between Chuckanut Square senior housing and the Haggen grocery store, a full traffic signal at 12th/Mill/Finnegan, 335 LF of sidewalk along west side of Finnegan Way, and a flashing crosswalk at 11th/Finnegan Way and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications All proposals must be on the Bid Proposal form provided by the City of Bellingham and must be accompanied by a certified check, cashiers check, cash, money order or bid bond payable to the Finance Director in an amount equal to or exceeding five percent (5%) of the total bid. Price Range: $1,200,000 - $1,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The right is reserved to postpone making the award for a reasonable length of time, to reject any and all bids, or to waive irregularities not affecting substantial rights Question Deadline 11/18/2024 at 4:00 PM PT Bidders are requested to review the Bid Documents carefully, without delay, for defects and questionable or objectionable matter. Questions, objections or comments regarding the Bid Documents or bid process should be made in writing and received by the issuing office no later than five (5) business days' prior to bid opening so that any necessary addenda may be published and distributed to bidders prior to the bid submission deadline; provided that the City may in its sole discretion respond to questions submitted after that deadline. This Contract provides for the improvement of the 12th Street and Finnegan Way Corridor with a flashing crosswalk at 12th/McKenzie between Chuckanut Square senior housing and the Haggen grocery store, a full traffic signal at 12th/Mill/Finnegan, 335 LF of sidewalk along west side of Finnegan Way, and a flashing crosswalk at 11th/Finnegan Way and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. See Exhibit "A" attached and incorporated herein by this reference.

Award

Roads / Highways

$1,306,658.00

Public - City

Paving, Site Work

108

6

6

5

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
77
Bidding Soon
1,744
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

January 27, 2025

img_map_placeholder

Multiple Locations, Bellingham, WA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

12th and Finnegan Multimodal Safety Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.