BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 9, 2024 at 7:00 PM

Updated December 10, 2024

Site work for a water / sewer project in Huntsville, Alabama. Completed plans call for site work for a water / sewer project.

** As of December 9,2024 , this project has not yet been awarded. The project is expected to be awarded on December 18,2024.** Madison County is seeking to replace and relocate approximately 2,400 linear feet of cast iron water main with Ductile Iron pipe along Moores Mill Rd and Countess Rd. The Contractor will be responsible for the installation of new main in accordance with the technical specifications. (a) Scope of Services The Contractor shall: o Install approximately 2,300 linear feet of new 12-inch ductile iron water main by open cut, including hydrants and valve assemblies, and approximately 80 linear feet of ductile iron pipe by jack and bore, as shown on the Construction Drawings; o Clear and grub the newly acquired Right of Way prior to installation of new water main; o Perform bores and open cuts for new main as shown on Construction Drawings; o Pressure test and disinfect the new main and services; o Relocate existing services to the new water main; o Connect the new main to the existing mains; o Repair driveways, culverts, and roadways to original condition or better; o Abandon existing mains and remove old hydrants and valve boxes; o Maintain appropriate erosion control; o Landscape yards and right-of way to original condition or better; o Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site. The Madison County Commission reserves the right to award this bid on an all-or-none or item by item basis, to refuse all bids, and to waive technicalities. Questions should be directed, in writing, to Vince Moody at vmoody@madisoncountyal.gov and Jennie Weatherly at jweatherly@madisoncountyal.gov Deadline for Contractor questions is December 2, 2024, at 3:00 PM There will not be a pre-bid meeting. Vendor Name, bid number, General Contractor License Number and opening date must show on envelope. Except during tie-ins that must be coordinated with Madison County Water, the existing water line shall remain in-service during construction, and work shall be performed to avoid any damage and service disruption to the existing main. The existing main will remain live until the new main and services have been successfully tested, and the new main is ready to connect to the existing main. Construction may be performed in phases. All work must be coordinated with Madison County Water. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated construction cost is $500k - $750k.

Bid Results

Water / Sewer

$436,900.00

Public - City

Site Work

12

11

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
49
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

Countess Rd NE & Moores Mill Rd, Huntsville, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.