BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Demolition, site work, new construction and renovation of a pre-engineered storage facility in Niagara Falls, New York. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a 17,605-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; and for the renovation of a pre-engineered storage facility.

Alterations required to provide HVAC upgrades / replacement of the existing two-pipe HVAC system and equipment including providing a new building management system, associated demolition and hazardous materials abatement, replacements of existing ceiling systems, and replacement of existing delaminating fire proofing. The project will be constructed under coordinated, concurrent multiple contracts including HVAC, General, and Electrical Construction Contract Work. Question Deadline 11/25/2024 RFIs will be accepted Each bidder must include with his bid, a certified check or bid bond, payable to the order of the City of Niagara Falls, in the amount of not less than FIVE (5) PERCENT of the price bid, subject to the conditions in the Instructions to Bidders. The successful bidder will be required to furnish a performance bond and labor and material payment bond, in form and substance, and with sureties approved by the City Corporation Counsel, in the amount of not less than ONE HUNDRED (100) PERCENTUM of the total amount of the accepted proposal. Contractor is required to complete the Insurance Information Form, Performance and Payment Bond Information Form, and other documentation specified in the Instructions to Bidders, when submitting a proposal. Contract term: approx. 1 year Location: Niagara Falls Public Library, 1425 Main Street, Niagara Falls, New York 14305 Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 12% Bid Results: GENERAL CONSTRUCTION CONTRACT Walter S. Johnson Bldg Co. $4,678,000 HVAC CONTRACT Greater Niagara Mechanical $453,200 PLUMBING CONTRACT DV brown $768,000 ELECTRICAL CONTRACT Frey Electric $525,000

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$6,424,200.00

Public - City

Demolition, New Construction, Renovation, Site Work

67

31

8

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
528
Active Projects
286
Bidding Soon
4,920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

February 3, 2025

Project location map

1785 New Rd, Niagara Falls, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.