Site work and paving for a sidewalk / parking lot in Stayton, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project includes, but is not limited to, all labor, materials, and equipment necessary to construct a parking lot consisting of approximately 415 CY of general excavation, 380 TON of 3/4 "-0" aggregate, 190 TON of Level 2, 1/2 " Dense asphalt, 330 LF of Standard Curb, two 320 SF raingardens, 460 LF striping, and performance of additional and incidental work as called for in the Plans and Specifications. The Engineer's Estimate for this project is $117,000 and $142,000. Document info : Each Bidder procuring Contract Documents must request to be included on the Plan Holders List maintained by the City of Stayton. Bidders shall provide a street address (not Post Office Box) where additional information (Addenda, etc.) may be delivered via the U.S Postal Service (registered mail with return receipt requested) or via an express mail carrier, and shall provide an official company contact person name with their e-mail address and contact phone numbers. Contact Ian Kintz Stormo at (503) 769-2919 or ikintz@staytonoregon.gov to be added to this list. Addenda and additional project information may be delivered via mail or e-mail transmission. If the Bidder obtains the Contract Documents from the City's website or is copied from a Contractor's , it is the responsibility of the Bidders, not the City, to check the City's website regularly for any addenda, clarifications, and other pertinent notifications prior to the Bid Closing date and time. To be notified of any addenda, call the Public Works Department at 503-769-2919 and request to be added to the Plan Holder's List All public improvements are required to conform to the 2021 City of Stayton Public Works Standard Construction Specifications. Each Bidder shall comply with the stated bidding requirements and all associated Bid forms provided in the Contract Documents. A ten (10) percent Bid Bond, certified check, or cashier's check shall accompany each Bid and shall be forfeited if the Bidder fails to enter into a Contract with the City of Stayton within fifteen (15) days after the dated "Notice of Award". The successful Bidder will be required to furnish evidence of required insurance and shall furnish a faithful Performance and Payment Bond, each in the amount of one-hundred percent (100%) of the total amount of the Contract. Upon successful completion of the Contract, and prior to City release of the Performance Bond, the Contractor shall furnish a completed Warranty Bond in the amount of thirty percent (30%) of the total amount of the Performance Bond, which shall remain in full force and effect until compliance with and fulfillment of all terms and provisions of the Contract's one (1) year warranty obligations. The Contract Documents contain a statement declaring that the Bidder agrees to comply with the provisions of ORS 279C.800 through 279C.870 regarding payment of prevailing wages. The City's Contract contains a clause which incorporates by reference all of the provisions of ORS 279A-C which are applicable to public contracts. Bidders are expected to be familiar with these provisions including, but not limited to, any most recent revisions to ORS 279C. No Bid shall be received or considered unless the Bidder is registered with the Oregon Construction Contractors Board for construction projects, as required by ORS 701.005 through 701.128, or licensed with the Landscape Contractors Board for landscaping projects, as required by ORS 671.530. It is anticipated that asbestos will not be encountered during the Project; therefore, the requirements of ORS 468A.700 through 468A.760 does not apply. Prequalification is NOT required. Each Bid must contain a statement as to whether the Bidder is a Resident Bidder, as required by ORS 279C.365(h). Out of State Bidders may have a percentage added to their Bids in accordance with ORS 279A.120. Bidders on public works projects with a Contract value of $100,000 or more, as defined in ORS 279C.370, are required to disclose within two (2) hours after Bid opening, the Bidders certain first-tier subcontractors. The Bidder shall provide the information as required on the first-tier disclosure form provided in the Contract Documents. A pre-bid conference will not be held for potential Bidders. The City of Stayton reserves the right to waive any informality or to reject any Bid not in compliance with all prescribed bidding procedures and requirements; and may reject any or all Bids upon finding of the Stayton City Council that it is in the bet public interest to do so. For project information, contact Ian Kintz-Stormo at (503) 769-2919. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Sidewalks / Parking Lot
$97,400.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
January 6, 2025
400 E Florence St, Stayton, OR
Related To This Project
Stayton, OR
Bid Date: Apr 10 2025
Stayton, OR
Bid Date: Jul 30 2025
Stayton, OR
Bid Date: Dec 10 2025
Stayton, OR
Bid Date: Oct 31 2024
Stayton, OR
Bid Date: Apr 04 2024
Stayton, OR
Bid Date: Mar 21 2024
Stayton, OR
Bid Date: Apr 23 2024
Stayton, OR
--
Stayton, OR
Bid Date: Feb 28 2022
Stayton, OR
Bid Date: Dec 28 2021
Stayton, OR
Bid Date: Aug 24 2023
Stayton, OR
--
Stayton, OR
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.