BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 11, 2026

Site work and new construction of a civil project in Stayton, Oregon. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Channel restoration and management actions including removal of accumulated bed material, installation of large wood structures, construction of a point bar and engineered riffles, and placement of bed material. Bonds: 100% Performance Bond, 100% Payment Bond. The City of Salem (City) owns and operates a public municipal water treatment facility located on Geren Island on the North Santiam River (River) between river mile 30 and 31, near Stayton, OR. The treatment facility provides 99 percent of the City's potable water, as well as water for the City of Turner and other local districts, providing service to approximately 220,000 customers. The river flows around Geren Island via two distinct channels - the North Channel and the South Channel. The North Channel provides water to intakes for the City's treatment facility, as well the Santiam Water Control District's (SWCD) irrigation system which supplies the City of Stayton's municipal water treatment facility and the Salem Ditch. The North Channel also supplies water to the City's designated recovery area for Oregon chub. Progressive changes in the morphology of the North Channel and adjacent floodplain have resulted in a reduction in water surface elevation and flow rates in the North Channel during the summer low flow conditions, ultimately resulting in less water flowing past the water intakes. The project includes implementing a series of channel restoration and management actions within the River designed to work in combination to increase low summer flows and reduce high winter flows in the North Channel, with the purpose of maintaining channel stability and consistent water flow within the channel. Construction of improvements to the existing Project will include: Removal of accumulated bed material at multiple sites within the River Installation of large wood structures Construction of a point bar and engineered riffles within the River Placement of removed bed material at other sites within the River Improvements will be constructed within the approved budget and according to the approved project schedule. Question Deadline 08/06/2026 at 5:00 PM PT In writing to Shawna Self, Contracts and Procurement Division, 555 Liberty Street SE, Room 330, Salem, Oregon 97301 or by email to sself@cityofsalem.net

GC Bidding

$2,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
10
Bidding Soon
1,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.