BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2025 at 7:00 PM

Updated June 21, 2025

Renovation of an educational facility in Santa Cruz, California. Completed plans call for the renovation of a 74,188-square-foot, two-story above grade educational facility.

The project includes interior and exterior renovation of Buildings A and B at Westside Research Park (WRP). The renovation impacts approximately 33,000 square feet of interior existing occupied building office spaces in a two-phased approach. Special care and attention shall be adhered to assure building occupants can safely occupy and access areas of WRP during construction activities. The interior and exterior renovations to Buildings A and B is proposed to meet the contemporary academic research requirements and includes renovation to the following: the lobby, the south half of the office spaces to the west of the lobby, and the servery. Significant updates and replacement of major infrastructure includes roofing, exterior perimeter soffits, mechanical, electrical, plumbing, fire sprinkler, telecommunications, visual and access control security systems, fire alarm and audio-visual systems. Location UCSC Westside Research Park, 2300 Delaware, Santa Cruz, CA Bidders may be required to submit qualifications with their bids as set forth in the Supplementary Instructions to Bidders. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5PM January 16, 2025 and addressed only to: David Sullivan University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street, Barn G Santa Cruz, CA 95064 dsulliv1@ucsc.edu The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: General Building Construction CSLB Lic. B Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage ($15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Estimated construction cost of Base Bid: $24,000,000

Bid Results

Educational

$17,960,000.00

Public - State/Provincial

Renovation

229

41

76

8

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
4
Bidding Soon
1,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 14, 2025

Project location map

2300 Delaware Ave, Santa Cruz, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.