Site work and paving for a road / highway in Hubbell, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction of Garfield Avenue From Butterworth Street to Fulton Street Phase 1 Substantial Completion Date: 56 days from the start of construction but no later than August 21, 2026 Phase 2 Substantial Completion Date: 56 calendar days from the start of construction but no later than October 30, 2026 Final Completion Date: May 7, 2026 Questions relating to this Bid shall be referred to: Administrative: Dan Siminski, P.E. Project Manager City of Grand Rapids- Engineers Office 300 Monroe Avenue NW Grand Rapids, MI 49503 (616) 456-4253 dsiminski@grcity.us a certified check or certificate of deposit payable to the order of the City of Grand Rapids in the sum of 5% of the bid amount or a bid bond issued by an approved Surety Company. Bidders and subcontractors must comply with the City of Grand Rapids prequalification and certification requirements. Docs note : A non-refundable charge of $110.00 will be charged for each hard copy set of project documents. A hardcopy of the Grand Rapids Construction Specifications may be obtained for an additional charge of $20.00 or may be accessed electronically If the work is not completed on or before the date(s) stated or time specified, the City Manager is, because of the difficulty in estimating damages, authorized to retain out of the money which may be due or become due the sum of $1,500.00 for each calendar day by which the Bidder, as Contractor, shall fail to achieve substantial completion of the work; and the sum of $1,500.00 for each calendar day by which the Bidder, as Contractor, shall fail to achieve final completion of the work, said sum to constitute liquidated damages and not a penalty. The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] or conditional Bids; or to advertise for new Bids This work consists of water main replacement, lead service replacement, minor storm upgrades, ADA upgrades, road reconstruction During the performance of this Contract, Contractor shall conduct the work in a manner that carefully and considerately assures the maximum possible safety and convenience of pedestrians, businesses, residents, property owners, and vehicular traffic. The Engineer will strictly enforce the relevant Specifications, including Progress Schedule and Sequence of Construction to achieve the intent of this goal. Question Deadline 12/10/2024 All questions about the meaning or intent of the Bidding Documents shall be submitted to the Engineer in writing. Replies will be issued by Addenda, mailed, faxed, electronically or otherwise delivered to all parties, recorded by the City as having received the Bidding Documents. Questions received less than 5 business days prior to the date for opening of Bids will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Questions- Questions relating to this Bid shall be referred to: Administrative: Dan Siminski, P.E. Project Manager City of Grand Rapids- Engineers Office 300 Monroe Avenue NW Grand Rapids, MI 49503 (616) 456-4253 dsiminski@grcity.us

GC Bidding

Roads / Highways

$50,000.00

Public - City

Paving, Site Work

34

6

3

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
32
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

A Ave, Hubbell, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.