BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work and paving for a bridge / tunnel in Oregon City, Oregon. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.bendbulletin.com/localstate/oregon-democrats-unveil-1-9-billion-transportation-funding-plan/article_00c054f2-5e46-429a-bb2a-09a413805215.html Oregonians would pay more at the pump, higher fees when they buy a car or bike and see more money deducted from their paychecks to pay for transit under a wide-ranging plan released Thursday by Democratic lawmakers for filling a transportation deficit. The framework that Sen. Chris Gorsek, D-Troutdale, and Rep. Susan McLain, D-Forest Grove, released is the result of nearly two years of meetings and a statewide tour to hear about transportation needs. It comes as state and local transportation departments struggle to pay for basic maintenance like potholes and snowplows, let alone finish some major projects like the Rose Quarter highway improvement and Abernethy Bridge replacement in the Portland area. ------------------------------------------------------------------------------------------- https://djcoregon.com/news/2024/12/13/cost-of-bridge-improvement-work-jumps-by-72-million/ The cost of improving the Abernethy Bridge, which carries Interstate 205 between Oregon City and West Linn, has increased by $72 million, following a delay in construction. The Oregon Transportation Commission approved the increase during its Dec. 4 meeting. __________ Complete the seismic retrofits to the Abernethy Bridge by constructing ground stabilization. These ground stabilizations include deep soil mixing and jet grouting near the bridge foundations. Work type: Modern Mileposts : 8.30 to 9.11 8.30 to 9.12 9.12 to 9.15 9.13 to 9.16 9.16 to 9.99 9.17 to 10.76 10.01 to 10.77 10.77 to 11.09 10.78 to 11.09 Length : 0.81 0.82 0.03 0.83 1.59 0.76 0.32 0.31 Route : I-205 Highway : East Portland Freeway County - Clackamas As of May 5 2025, the project is in Conceptual status. Anticipated Fiscal year is 2026. ORDOT - I-205 Abernethy Bridge, Ground Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$50,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
49
Bidding Soon
1,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

I-205, Oregon City, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.