BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Gaffney, South Carolina. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Macedonia 0.45 MG Elevated Water Storage Tank of Bid Copies: 1 Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. Performance and Payment Bonds, each in the amount of 100% of the contract price will be required of the successful bidder. The project generally consists of a new 0.45 MG composite elevated water storage tank, demolition of the existing elevated water storage tank, approximately 755 LF of 10" waterline, and associated work tasks for a complete and proper installation. Construction Cost Range: $5,500,000 Project Location: Gaffney, SC Description: The overall project generally consists of a new 0.45 MG composite elevated water storage tank, demolition of the existing elevated water storage tank, approximately 755 LF of 10" waterline, and associated work tasks for a complete and proper installation. Funding for the project shall be provided via a SCIIP grant from the SC RIA and local match funding provided by the Gaffney Board of Public Works. As a result, contractors and subcontractors shall comply with the applicable contract provisions required by the Uniform Administrative Requirements, Cost Principals and Audit Requirements (also referred to as Uniform Guidance) found in 2 CFR 200 Appendix II. The Owner reserves the right to waive any irregularities, or to reject any or all bids. Bids may be held by the Owner for a period not to exceed ninety (90) days from the date of the opening of bids. Document notes Only those contract drawings, specifications, and bid documents obtained from the Engineer (or from

Sub-Bidding

Water / Sewer

$5,500,000.00

Public - City

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
77
Bidding Soon
1,168
All Active Projects
517
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

img_map_placeholder

To Be Determined, Gaffney, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.