BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work, paving and outdoor lighting for a mixed-use development in Carson City, Nevada. Design plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of October 28, 2025, an engineer has been selected, and this project is in the design phase. Design is projected to be completed January to November 2026. Bidding is slated for late 2026, with construction kicking off in spring 2027 and continuing for about 18 months. *The closed solicitation has been included below for reference: Carson City invites qualified firms to submit proposals for the Curry Street Complete Streets Improvement Project ("Project"): Survey, Environmental Review, Engineering Design, and Construction Support Services. This is a Federally Funded Project supplemented with various local funds. Curry Street is classified as a minor collector and, as a parallel route to S. Carson Street, serves to enhance circulation in the southwest area of Carson City by providing additional connectivity between the northwest residential neighborhoods and downtown core to the commercial corridor to the south. Within the majority of the project limits, Curry Street is a narrow, curvy, two-lane roadway with little to no shoulders, no multimodal facilities, limited sight distance in some locations, disconnected storm drain system, and roadside safety hazards in the form of steep, non-traversable slopes and utility poles within a few feet of the traveled way. It is cut into a hillside with steep embankment slopes along the Nevada State Railroad Museum and Forest Service properties to the east and along the Nevada State Lands properties to the west. Sidewalk is present along both sides of Curry Street at the south end of the project and north of the Forest Service properties at the north end. Bike lanes exist south of the project limits and terminate at the south leg of the Curry St/Rhodes St. intersection. The Project will connect the gap in multimodal and storm drain facilities and improve safety by widening Curry Street to provide continuous bicycle, pedestrian, and storm drain facilities in addition to lighting and roadside safety improvements along Curry Street from Rhodes St. to the existing sidewalk north of the Forest Service parcels 003-063-09 and 003-064-16. The method of Contractor Selection has not been Determined at this time. Question Deadline 01/13/2025 at 5:00 PM PT

Design

Roads / Highways

$4,500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
48
Bidding Soon
376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

S Curry St, Carson City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.