BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Carson City, Nevada. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Carson City invites qualified firms to submit proposals for the Curry Street Complete Streets Improvement Project ("Project"): Survey, Environmental Review, Engineering Design, and Construction Support Services. This is a Federally Funded Project supplemented with various local funds. Curry Street is classified as a minor collector and, as a parallel route to S. Carson Street, serves to enhance circulation in the southwest area of Carson City by providing additional connectivity between the northwest residential neighborhoods and downtown core to the commercial corridor to the south. Within the majority of the project limits, Curry Street is a narrow, curvy, two-lane roadway with little to no shoulders, no multimodal facilities, limited sight distance in some locations, disconnected storm drain system, and roadside safety hazards in the form of steep, non-traversable slopes and utility poles within a few feet of the traveled way. It is cut into a hillside with steep embankment slopes along the Nevada State Railroad Museum and Forest Service properties to the east and along the Nevada State Lands properties to the west. Sidewalk is present along both sides of Curry Street at the south end of the project and north of the Forest Service properties at the north end. Bike lanes exist south of the project limits and terminate at the south leg of the Curry St/Rhodes St. intersection. The Project will connect the gap in multimodal and storm drain facilities and improve safety by widening Curry Street to provide continuous bicycle, pedestrian, and storm drain facilities in addition to lighting and roadside safety improvements along Curry Street from Rhodes St. to the existing sidewalk north of the Forest Service parcels 003-063-09 and 003-064-16. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
16
Bidding Soon
188
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

img_map_placeholder

S Curry St, Carson City, NV

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.