Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 19, 2025 at 7:00 PM
Updated February 20, 2025
Site work for a water / sewer project in Stevens Point, Wisconsin. Completed plans call for site work for a water / sewer project.
**As of February 19, 2025, the project was awarded to Staab Construction Corp, with an awarded amount of $617,000.** Site Address: 300 Bliss Ave City: Stevens Point County: Portage County State/Province: WI The upgrade of an existing UV disinfection system: which includes the removal and replacement of three existing UV banks, the removal and replacement of three power distribution centers, the removal of three hydraulic system center and the replace of one hydraulic system center, the concrete modifications of (three) existing channels and the installation of a new transformer, power panel and auxiliary UV equipment. Additionally, the removal and replacement. Additionally, the replacement of existing of scum baffles, V-notch weirs, and troughs at both Final Clarifier No.1 and No 2. The City of Stevens Point, Wisconsin, hereby gives notice that sealed Bids will be received for the WWTP Clarifiers and UV Upgrades. The Work is generally described as follows: Removal of three individual channel mounted UV systems. Including, three UV banks, three power distribution centers, and three hydraulic system centers at Structure 140. Prepare existing channel walls to conform with the new depth and dimensions of the UV Banks as noted in the drawing set. Install a new Owner Furnished 480 volt power panel and transformer serving the UV System. Install new Owner Furnished UV Disinfection equipment. Remove and replace the scum baffles, v-notch weirs and troughs at Final Clarifier No.1 and No. 2 at Structure 130. Remove and replace three motor operated gates Dates for Substantial Completion and Final Payment A. Milestones 1 and 2 designated in Section 01 11 00 shall be completed by April 18th, 2025 B. The Work will be substantially completed on or before May 30th , 2025, and completed and ready for final payment in accordance with Article 15 of the General Conditions on or before June 30th 2025 Question Deadline 01/15/2025 Questions regarding the bid documents should be directed to Donohue & Associates attention: Eric Lynne, PE (Telephone 952-920-1811 email elynne@donohue-associates.com).
Award
Water / Sewer
$617,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2025
February 21, 2025
300 Bliss Ave, Stevens Point, WI
Related To This Project
Stevens Point, WI
Bid Date: Feb 18 2025
Stevens Point, WI
Bid Date: Mar 26 2019
Stevens Point, WI
Bid Date: Feb 25 2025
Stevens Point, WI
Bid Date: Feb 18 2025
Stevens Point, WI
Bid Date: Mar 04 2025
Stevens Point, WI
Bid Date: Mar 04 2025
Stevens Point, WI
Bid Date: Mar 04 2025
Stevens Point, WI
Bid Date: Mar 27 2025
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
Bid Date: Nov 12 2024
Stevens Point, WI
Bid Date: Oct 02 2024
Stevens Point, WI
Bid Date: Oct 01 2024
Stevens Point, WI
Bid Date: Sep 04 2024
Stevens Point, WI
Bid Date: Aug 21 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed