BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Columbus, Indiana. Conceptual plans call for site work for a water / sewer project.

The project consists of the preparation of a preliminary design summary for the upgrade of the 8th Street and Clifty lift stations followed by the development of construction drawings and specifications. The Clifty lift station receives flow from a large gravity sewer area as well as three remote lift stations outside the City limits. The lift stations pumping to the Clifty lift station are being upgraded to increase capacity in 2024, and there are potential growth areas in the Clifty lift station basin. The 8th Street lift station receives flow from the area shown in the attached figure, which has seen significant residential growth over the past 8 years. The 8th Street lift station also receives flow from Driftwood Utilities, which has a new significant industrial user. Both lift stations included in this project are regional, triplex stations and should meet CCU lift station standards. Key items to be included as part of the preliminary design are the following: 1.Review of level data and pump run times provided by Columbus City Utilities 2.Review of potential growth areas in each lift station basin 3.Recommended pump sizing 4.Recommended electrical upgrades After the completion of the preliminary design, construction drawings and specifications will be developed. The Scope of Services should include detailed design and contractor procurement assistance. The contractor procurement is anticipated to be through a Guaranteed Savings Contract or Build Operate Transfer contract. Construction Start: December 2025 The design services will be funded through a Bond Anticipation Note, and project construction will be funded through either the Indiana State Revolving Fund Loan Program or a private bond. Question Deadline 01/23/2025 at 12:00 PM ET Contact for Questions: Ashley Getz, Associate Director of Engineering agetz@columbusutilities.org. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
37
Bidding Soon
869
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.