BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Site work for a civil project in Columbus, Indiana. Conceptual plans call for site work for a water / sewer project.

The following projects are described in CCU's Master Plan. 1.WTP No. 2 Raw Water Main Replacement This project includes the construction of a parallel raw water main from the Marr Glick wellfield to WTP No. 2 for redundancy and capacity. 2. 16" Transmission Main (Directionally Drilled) - Marr Road This project includes the replacement of an existing portion of 16" transmission main under Haw Creek. The existing main is currently visible in Haw Creek due to erosion of the creek over time. 3. 16" Transmission Main (Directionally Drilled) - 10th Street This project includes the replacement of an existing portion of 16" transmission main under Haw Creek. The existing main is currently visible in Haw Creek due to erosion of the creek over time. 4.2nd Street Water Main Replacement This project was identified in a Water Main Replacement Prioritization Program by GRW Engineers in 2020. INDOT is planning to reconstruct 2nd Street from the bridge over East Fork White River to State Street in 2026. CCU has very old and difficult to locate water mains in 2nd Street, so the intent is to replace the water main ahead of the INDOT project. The Scope of Services should include detailed design and contractor procurement assistance for the above projects. The contractor procurement is anticipated to be through a Guaranteed Savings Contract, Build Operate Transfer contract, or traditional bid. Construction Start: December 2025 The design services will be funded through a Bond Anticipation Note, and project construction will be funded through either the Indiana State Revolving Fund Loan Program or a private bond. Question Deadline 01/23/2025 at 12:00 PM ET Contact for Questions: Ashley Getz, Associate Director of Engineering agetz@columbusutilities.org. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
97
Bidding Soon
1,722
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.