Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work for a civil project in Newmanstown, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Work to be performed for the project includes supplying all labor, equipment, and materials for waterproofing, installation of a duckbill check valve for the overflow air gap, replacement of one shell manhole with a 30" manhole, and removal of shell ladder cages. Additional tasks involve adding a lockable 8' ladder guard, installing galvanized flexible cable safety climbs on both the upper and interior ladders, modifying the shell ladder for OSHA compliance, and replacing the roof vent with a 24" flanged vent neck and PV vent. Question Deadline 01/15/2025 at 4:00 PM ET Location : online portal. Each Proposal for the Project shall be accompanied by a Bid Security in the form provided by the Contract Documents, drawn to the order of the Womelsdorf-Robesonia Joint Authority, and in an amount not less than ten percent (10%) of the extended Bid Amount, as a guarantee that if the Proposal is accepted, a Contract will be entered into and the performance thereby properly secured. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. The Womelsdorf-Robesonia Joint Authority, Owner, hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, to waive any informality in bids received, and to accept the Bid, which is in the best interest of the Authority, consistent with the laws affecting municipal contract awards. The Work required for this Project involves the construction of improvements to the existing Gold Springs Water Storage Tank, is defined by the Contract Documents, and consists of the following (see Attachment B - MBA Inspection Report for details and design standards):Distribution Pipe Mixing System: Install a new 8" Red Valve Manifold Pipe, along with 3" diameter Tideflex Series 35 Upper Inlet Nozzle and 2" diameter Tideflex Series 35 Lower Inlet Nozzle, into the interior of the tank, as it is currently a bottom feed tank. Provide pipe supports as shown in Attachment C, along with tee and valve. This new riser pipe would help to mix the tank during well run cycles. 2. Install Overflow Air Gap Siphon and New Duckbill: Modify the overflow air gap by installing a Tideflex or similar duckbill-style check valve at the discharge end of the upper pipe. Additionally, install a concentric reducer on the lower pipe section that runs below grade to ensure proper flow management. 3. Replace Shell Manhole: Remove the existing shell manhole and replace it with a new 30-inch diameter manhole to enhance accessibility and maintenance. 4. Remove Shell Ladder Cages: Completely remove the shell ladder cages and grind down any remaining attachments to create a flush surface, improving safety and usability. 5. Install Lockable 8-Foot Ladder Guard: Install an 8-foot aluminum ladder guard on the upper shell ladder, ensuring it is positioned to provide adequate clearance from the platform handrails for safe access. 6. Install Galvanized Flexible Cable Safety Climb on Upper Shell Ladder: Install galvanized flexible cable safety climb devices along the span of the upper shell ladder to enhance worker safety during access. 7. Modify Shell Ladder to Roof Opening and Install Self-Closing Swing Gate: Modify the shell ladder openings to increase pass-through size to 24 to 30 inches, and install a self-closing swing gate to meet OSHA compliance for safety. 8. Replace Roof Vent with Flanged 24-Inch Vent Neck and Install 24-Inch PV Vent: Remove the existing roof vent and install a new repad, along with a 24-inch flanged vent neck and a 24-inch diameter aluminum pressure vacuum (PV) vent to improve ventilation efficiency. 9. Install Stainless Steel Flexible Cable Safety Climb on Interior Ladder: Install stainless steel flexible cable safety climb devices on the interior ladder to provide additional safety features for personnel accessing elevated areas. 10. Lower Overflow Intake: Lower the overflow intake to below rafter level to prevent backflow and ensure efficient drainage, addressing potential overflow issues effectively

Award

Water / Sewer

$45,850.00

Public - City

Site Work

3

23

2

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
547
Active Projects
253
Bidding Soon
3,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

February 21, 2025

Project location map

318 S Sheridan Rd, Newmanstown, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.