BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Murphy, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

City: Murphy County: Owyhee State/Province: ID Site Directions: From the SH-45 Bridge over the Snake River Head southwest on ID-45 S 0.3 mi Slight left to stay on ID-45 S 0.4 mi Continue onto ID-78 E 0.4 mi Turn right onto Reynolds Crk Rd/Upper Reynolds Creek Rd 9.8 mi Slight right 0.8 mi Slight right onto Hootenany Rd 1.7 mi Turn right onto Salmon Creek Rd Description: Existing Bridge Key Number 28298 is located in Owyhee County near Murphy, Idaho and carries Salmon Creek Rd (gravel) over Reynolds Creek. This proposal is for the contractor to remove the existing single span bridge and replace with a single span concrete voided slab bridge composed of abutments/ wingwalls and Geosynthetic Reinforced Abutment Backfill. The road will be closed during construction and traffic will be detoured onto an existing Shoofly Rd. Additional work includes reconstruction of roadway approaches, riprap, and removing the existing Shoofly Rd after the bridge is complete.

Bid Results

Bridges / Tunnels

$1,477,000.00

Public - County

Demolition, New Construction, Paving, Site Work

71

10

4

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
2
Bidding Soon
205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 17, 2025

Project location map

Salmon Creek Rd, Murphy, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.