BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a road / highway in North Waltham, Massachusetts. Completed plans call for site work for a road / highway.

New Traffic Signal Mast Arm at Bacon/Plympton/Athletic Field Installing a new traffic signal mast arm at Bacon, Plympton and Athletic Field Rd. The project consists of: The City shall provide the Contractor with an existing 35-foot traffic signal mast arm The Contractor shall install a new foundation at the back of the sidewalk in the southeast corner of the intersection of Bacon Street/Plympton Street/Athletic Field Road, with the 35-foot mast arm (provided by the City) aligned as shown in the figure. The Contractor shall provide the appropriate anchor bolts for this mast arm. The bolt pattern of the existing mast arm will be provided to the Contractor. The Contractor is responsible for the proper design of the foundation, using MassDOT Standard Drawing for Type II Mast Arm Cored Pier Foundations, assuming light loading conditions and clay soil type. Soil samples are not required. The Contractor shall affix a bracket at the end of the mast arm that holds four one-section signal heads (one facing each approach to the intersection): o The signals facing Bacon Street northbound and Bacon Street southbound shall each be yellow lens o The signals facing Plympton Street eastbound and Athletic Field Road westbound shall each be red lens The Contractor shall install conduit as necessary, providing the Service Connection to the utility pole closest to the mast arm location, just to the south on Bacon Street. The Contractor shall install all wiring as necessary to provide a fully operational traffic signal, with the signals in flashing operation 24 hours per day: o Signal heads facing Bacon Street northbound and Bacon Street southbound shall be flashing yellow o Signal heads facing Plympton Street eastbound and Athletic Field Road westbound shall be flashing red The Contractor shall install control cabinet and meter socket on side of mast arm. Meter shall not be higher than six feet above the ground. Prevailing Wage Law applies. Certified Payrolls required weekly. Contact Name: Mike Garvin Contact Phone Number: 781-314-3404

Bid Results

Roads / Highways

$26,898.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
160
Bidding Soon
4,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 6, 2025

Project location map

610 Main St, North Waltham, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.