EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Marion, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The general nature of the work on which bids are requested is: 31,284 SY of milling, 3,018 TON of HMA Overlay Surface Course, 2,921 TON of HMA Overlay Base Course, 2,782 SY of Full Depth HMA Patches, 28.7 STA of Painted Pavement Markings Solvent/Waterborne, and miscellaneous related work and appurtenances in accordance with the contract documents. Engineer's Estimate: $1,509,052.00 Doc note - The plans and specifications are now on file in the office of the City Clerk. Copies thereof may be obtained at the office of the Engineering Department. One set of bidding documents for the above project is available without charge to prospective bidders, i.e. qualified general contractors and subcontractors. A $20.00 fee will apply to additional sets and to bidding documents requested by other than prospective bidders as defined herein. A fee for shipping will also be included and is due prior to shipping. The City of Marion Engineering Departmentis the only authorized source of bidding documents and proposal forms. Bidding documents and proposal forms obtained from any other source may have an incomplete set of documents. Bidders using bidding documents and/or proposal forms not obtained from the City of Marion EngineeringDepartment are advised to contact the City of Marion EngineeringDepartment to provide a contact name, mailing address and phone number to enable receipt of necessary addenda. Reproduction of these documents without the express permission of the City of Marion is prohibited. Work shall be completed no later than September 26, 2025. Liquidated damages in the amount of $300.00 per calendar day will be assessed for work not completed within this time. Each bidder shall accompany its bid with bid security as defined in Code of Iowa Section 26.8 and as specified in the Instructions to Bidders. 10% bid bond Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the contract. In lieu of a maintenance bond, the performance and payment bonds may provide coverage for the specified maintenance term. A separate and distinct statement to this effect must be included on the bonds. The City does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Bid Results

Roads / Highways

$1,522,150.00

Public - City

Paving, Site Work

31

5

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
44
Bidding Soon
649
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 28, 2025

img_map_placeholder

Multiple Locations, Marion, IA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 HMA Resurfacing Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.