EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Morgantown, West Virginia. Completed plans call for site work for a water / sewer project.

The work includes construction of approximately 500 linear feet of 48-inch HDPE, 275 linear feet of 42-inch HDPE, 265 linear feet of 36-inch HDPE, and 80 linear feet of 18-inch HDPE stormwater piping; 1 6-foot diameter stormwater manhole, 6 5-foot stormwater inlets, 3 4-foot stormwater inlets, 2 Type B inlets, 20 linear feet of stormwater trench drain; and other related appurtenances. Bids are to be submitted in accordance with Article 13 of the Instructions to Bidders. The two-envelope system will be used for the Bid opening procedures. No Bid will be received unless accompanied by a Bid Bond equal to at least five percent of the Bid, payable to the Owner as a guarantee that after a Bid is accepted, Bidder will execute and file the Agreement, Insurance Certificate, and 100% Performance and Payment Bonds within fifteen days after the Notice of Award. Bids will be accepted from only those Bidders who obtain Documents from the Owner. In connection with the performance of under this Contract, Contractor shall comply with all applicable Local, State, and Federal labor laws. The Morgantown Utility Board reserves the right to reject any or all Bids, to waive any informality and/or technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 90 days after the time set for opening Bids. West Virginia Code 21-1D-5 provides that any solicitation for a public improvement construction contract requires each vendor that submits a Bid for the work to submit at the same time an affidavit of compliance with the Bid. The enclosed Drug-Free Workplace Affidavit must be signed and submitted in the first envelope as evidence of the vendor s compliance with the provisions of Article 1D, Chapter 21 of the West Virginia Code. Failure to submit the signed Drug-Free Workplace Affidavit in the first envelope shall result in disqualification of such Bid. Any Contractor submitting a Bid on this project hereby certifies, indicates, and acknowledges that he/she has a valid and current General Engineering Contractor License from the State of West Virginia and meets all the qualifications required by the statutes of the state and subdivision in which the work is to be performed

Post-Bid

Water / Sewer

$870,000.00

Public - City

Site Work

11

17

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
53
Bidding Soon
673
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 7, 2025

img_map_placeholder

Multiple Locations, Morgantown, WV


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Valley View Stormwater Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.