BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work and outdoor lighting for a road / highway in Commerce City, Colorado. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Harvest Road - Streetlights All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda. Questionsreceived less than eight (8) days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. This Contract provides for the construction of the following: Approximately 1 mile of roadway streetlighting on the west side of Harvest Road. The project includes about 1 mile of conduit, 1 pedestrian light, and 29 street lights. The project is located along west side of Harvest Rd between E. 56th Avenue and E. 48th Avenue. Bids will be received providing unit price for items; however, the price given will be on a maximum not-to-exceed amount, as described in the Bidding Documents. The Work is expected to be commenced within Sixty (60) days after the Date of Contract. Bid Security in the amount of five percent (5%) of the total Bid Price must accompany each Bid in the form specified in the Instructions to Bidders. The Successful Bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond guaranteeing faithful performance and warranty bond for two-years after Substantial Completion, and the payment of all bills and obligations arising from the performance of the Contract. and obligations arising from the performance of the Contract. The OWNER reserves the right to award the contract by sections, to reject any or all Bids, and to waive any informalities and irregularities therein. For further information, please contact Barney Fix at Merrick & Company at 303-751-0741.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Outdoor Lighting, Site Work

15

10

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
115
Bidding Soon
1,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

April 7, 2025

Project location map

Harvest Rd, Commerce City, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.