BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

* Award subject to final approval. The scope of this project includes the removal of the existing interior wood doors and replacing them with new hollow metal doors, hardware and paint. The project is to be completed after school hours Question Deadline: Wed Feb 12, 2025 4:00:00 PM (EST) Duration in months: 24 Site Walkthrough Event Failure to meet any of the above will result in automatic disqualification from the tender process. Respondents shall attend the site meeting at their own risk and hold the Board harmless for any issues or damages arising out of their attendance of the site meeting. The Board will not consider any claims for additional payments during the execution of the Work for extra work or difficulties encountered resulting from conditions which were either visible or could be reasonably inferred from an examination of the Place of the Work and the available project information prior to the submission of Proposals. The contractors should refer to the specifications, drawings, and photos for the other site details. Documents can be obtained from https://ldsb.bidsandtenders.ca/

Award

Educational

$175,450.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
81
Bidding Soon
904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

Project location map

190 Welborne Ave, Kingston, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.