Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 31, 2025 at 8:00 PM
Updated April 1, 2025
Renovation of a mixed-use development in Seattle, Washington. Completed plans call for the renovation of a educational facility; and medical facility.
The project scope includes architectural, mechanical, electrical scope with an approximately project value of $17,500,000. UW# 207852/ UW FACNUM 6446/ SDCI PROJECT #6996804-CN/ CRS# 61498736 Questions about this project should be directed to: A/E Name: Ankrom Moisan Architects Contact Person: Juan Flores Phone Number: 206.576.1633 Email: juanf@ankrommoisan.com University of Washington Medical Center Northwest A-wing Floor 4-5 Renovation project The project includes the following work: The primary scope is the renovation of approximately 40,000 SF of the existing 4 th and 5 th floors of the University of Washington Medical Center Northwest A-wing, 1550 N 115 th Street Seattle, WA 98133. These floors are comprised of medical/surgical inpatient units with 36 patient rooms per floor. This is an interior tenant improvement only with no changes to building envelope. The renovation will meet the requirements of the Department of Health licensing. Project scope is limited to avoid a substantial alteration designation and Seattle Energy Code upgrades. Patient rooms and nurse stations will be updated with a more efficient layout and refreshed finishes. Patient room updates will include installation of new patient lifts, headwalls, plumbing fixtures, nurse call system, lighting and wall and floor finishes. Nurse stations will be updated with a more efficient layout and will minimize noise throughout the unit. The corridors will be updated with new flooring, wall finishes, lighting and wayfinding. Staff lounge and conference rooms will be updated. Mechanical system scope includes the replacement of the heating, ventilation, and cooling systems (HVAC) ductwork and VAV boxes and plumbing scope is to replace in-kind lavatories and water closets. Medical gas scope includes replacement of outlets in patient headwalls and new zone valve boxes. Electrical scope includes minor electrical and low voltage upgrades. Construction will occur in 2 phases per floor, non-concurrently, for a total of 4 phases. While construction is occurring on one half of a floor, the other half will continue to be an occupied inpatient unit. There will be a 2-week transition period between each phase to allow for UWMC to move in and move out. Thorough coordination will be required throughout all phases of construction to minimize impacts to the occupied space adjacent, above, and below the construction site.
Bid Results
Medical
$11,494,520.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
