BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a mixed-use development in Verona, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

W Verona Avenue and Legion Street, Westlawn Avenue Est. Value Notes: Engineer Estimate Est. Completion Date: Sept. 26, 2025 Pre-Qualification: Yes PROJECT: The major work includes the reconstruction and signalization of W Verona Avenue & Legion Street and the installation of a rectangular rapid flashing beacon system and curb ramp reconstruction at W Verona Avenue & Westlawn Avenue. These projects will be bid as one package with one bid total. The projects include installation of traffic signal equipment, pavement patching, traffic control, pavement marking, signing, street terrace restoration, erosion control, and all appurtenant work. The work consists of the following items: Approximately 155 linear feet of culvert pipe corrugated polyethylene 15 Inch Storm sewer pipe, 166 linear feet of Storm Sewer Reinforced Concrete, 2 manholes 4-ft diameter, 912 square yards of removing asphaltic surface, 1,508 cubic yards of common excavation, 2,068 tons of base aggregate dense, 4,820 square feet of concrete sidewalk 5-Inch, 750 square feet of concrete sidewalk 7-Inch, 190 square yards of concrete driveway 7-Inch, 597 linear feet of concrete curb and gutter, 529 tons of HMA pavement 4 MT 58-28 S, 1,038 linear feet of sawing pavement, pavement markings, traffic signals at the intersection of W Verona Avenue & Legion Street, RRFB system at the intersection of W Verona Avenue & Westlawn Avenue and all appurtenant work. BID SECURITY: A bid bond or certified check, payable to the City of Verona, in the amount of not less than 5% or more than 10% of the Bid shall accompany each Bid as a guarantee that if the Bid is accepted, the bidder will execute the contract and furnish 100% performance and payment bonds within 15 days after notice of award of the contract by the City. WAGE SCALE: Prevailing hourly wage rates are not required as Part of Wisconsin Act 55. CONTRACTOR and SUBCONTRACTOR shall pay competitive wages for each classification of employee engaged in the work. BID REJECTION: The City reserves the right to reject any and all Bids, to waive any technicality, and to accept any Bid which it deems advantageous to the City's best interest. BID WITHDRAWAL: All Bids shall remain subject to acceptance for a period of 60 days after the time and date set for the opening thereof. Question Deadline 02/18/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Bid Results

Roads / Highways

$639,795.00

Public - City

Paving, Site Work

279

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
116
Bidding Soon
1,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

March 27, 2025

Project location map

Multiple Locations, Verona, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.