BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Estes Park, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

SCOPE: The Performance Park Bridge site is located west of downtown Estes Park generally north of the West Park Center and Big Horn Restaurant situated on W Elkhorn Avenue. The existing bridge measured approximately 13' wide and 25' long. It was estimated to be installed in the 1960s. It connects the Performance Park parking lot to the Fall River Trail and the Performance Park outdoor events amphitheater. The highest demand for foot and bike traffic is during the summer visitation season from late May through October. Occasional light vehicle use occurs to deliver sound equipment to the amphitheater during the summer outdoor events. Winter use consists of low volumes of cyclists and pedestrians and snow removal equipment as needed. Question Deadline 07/28/2025 at 5:00 PM MT Questions are submitted online No Substantial Completion Friday, June 5, 2026 Construction Completed Friday, June 26, 2026 A Bid Guarantee in an amount equal to 5% of the total Bid amount is required at the time of the Bid Opening. The Guarantee must be a certified check payable to the Town of Estes Park or a satisfactory Bid Bond executed by the Bidder. If awarded the two Contracts, a Performance Bond and a Labor and Material Payment Bond are required within ten days of the date on the written Notice of Award, each for the total amount of the Contract Price. No Bidder may withdraw a Bid for a period of thirty days after the date fixed for opening the Bids. The Town of Estes Park reserves the right to cancel this Invitation to Bid; reject any Bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the Bids received, when it is in the Town's best interest to do so.

Award

Bridges / Tunnels

$404,964.00

Public - City

Demolition, New Construction, Paving, Site Work

4

5

2

5

Subscribe For Documents

116 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
72
Bidding Soon
1,273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 24, 2025

Project location map

431 W Elkhorn Ave, Estes Park, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.