Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work for a water / sewer project in Molalla, Oregon. Completed plans call for site work for a water / sewer project.

Lola Avenue Sewer and Water Line Replacement The project consists of: Full depth street reconstruction and widening of approximately 925 linear feet of roadway on Lola Avenue and 480 linear feet of roadwayon E 3rd Street, plus 210 linear feet of AC surface replacement on E 4th Street.Removal and replacement of three (3) sanitary sewer manholes and the removaland replacement of approximately 890 linear feet of 8-inch sanitary sewer lineplus 620 linear feet of 4-to-6-inch sanitary sewer lateral piping, including lateralconnections and cleanouts. Installation of approximately 960 linear feet of new8-inch water line and 260 linear feet of new 6-inch water line including new firehydrants, new water service connections, and connections to existing water service lines. Installation of approximately 230 linear feet of new 10-inch storm lineincluding removal of old storm line and catch basins, installation of six (6) newcatch basins, and connections to existing storm manholes. ids not fully completed in accordance with the Instructions to Bidders will notbe considered. A Bid Security executed in favor of the Owner in the amount ofnot less than 10% of the total amount of the Bid is required. Per ORS 279C.385(2), Bid Security is to be forfeited as fixed and liquidated damages should theBidder neglect or refuse to enter into a Contract and provide suitable insurancecertificates, bonds, and other required documents for the faithful performance ofthe work in the event the Bidder is awarded the Contract. A Pre-Bid Conference will not be held. Each Bidder must submit a First-Tier Subcontractor Disclosure Form, Evidenceof Authority to Sign Bid, and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. Contractors shall state whether they have ever been terminated by the City ofMolalla under a public contract. If termination exists, the City shall declare theBidder to be non-responsible and therefore not eligible for award. Contractors and all subcontractors shall pay at least the state prevailing rate ofwage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will beadministered and enforced in accordance with state law and regulations. No Bid will be received or considered by the Owner unless the Bid contains: 1)a statement that Bidder will comply with the provisions of 40 USC 276a and ORS279C.840 and 2) a statement as to whether the Bidder is a resident Bidder asdefined in ORS 279A.120. The Owner reserves the right to reject any or all Bids,to waive all informalities, and to accept such Bids that in the opinion of the Ownerare in the best interest of the Owner. Est. Value Notes: $1,620,000 to $1,950,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/12/2025.

Bid Results

Water / Sewer

$1,256,759.00

Public - City

Site Work

30

19

2

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
70
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

May 19, 2025

Project location map

Lola Ave, Molalla, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.