Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work and new construction of a mixed-use development in Molalla, Oregon. Completed plans call for the construction of a educational facility; for site work for a educational facility; water / sewer project; and water / sewer project.
SPECIAL INSTRUCTIONS TO BIDDERS: A. Scopes of Work Already Awarded: 1. Earthwork, utilities, survey, demo, mechanical, electrical, and plumbing as relates to Bid Package 1 only. B. Future Work: Not applicable SCOPE OF WORK A. All scopes of work (Div. 2-33) including, but not limited to: o Division 02 (Demo, Survey) o Division 03 (CIP Concrete, Polished Concrete, Precast Concrete, Cast Underlayment) o Division 04 (Masonry) o Division 05 (Steel Supply/Install) o Division 06 (Rough Carpentry, Casework & Finish Carpentry, GluLam) o Division 07 (Waterproofing, Exterior Siding, Roofing, SM Flashing, Roof Specialties, Joint Sealants, Expansion Joint Assemblies) o Division 08 (Doors, Frames, Hardware, Overhead/Sectional Doors, Storefronts) o Division 09 (Drywall, Painting, Flooring, Tile, Performance Arts and Athletic Flooring) o Division 10 (Specialties, Lockers, Fireplaces, Final Clean, Toilet Compartments) o Division 11 (Trash Compactor, Residential, Food Service, Lab, Theater and Athletic Equipment) o Division 12 (Bleachers, Window Treatments) o Division 14 (Elevator) o Division 21 (Fire Suppression) o Division 22 (Plumbing) o Division 23 (Mechanical) o Division 26 (Electrical, LV, Security) o Division 31/33 (Earthwork and Utilities) o Division 32 (Site Concrete, Asphalt, Pavement Specialties, Fencing, Site Furnishings, Landscaping) B. CM/GC intends to bid the Div. 3- Concrete and Div. 6- Non-Structural Rough Carpentry, - Div 6 - Finish Carpentry (MDO & FRP) Div 6 - Rough Carpentry Material Package, Div 9 - Protection of finishes and Div 10 - Install Accessories and will do so as a competitive bid. Pence Contractors is requesting proposals for the Molalla River Middle School Replacement project in Molalla, OR. This new construction middle school will be built on the existing school grounds. The proposed two-story building will be approximately 115,000 square feet and consist of a slab on grade/slab on metal deck structure. Scopes of work will include, but are not limited to, earthwork/utilities, framing, MEP, storefronts, and site improvements. All scopes of work are out to bid. Please see plans room for a complete list of scopes. Pence plans to bid the following scopes as self-perform: Div. 3- Concrete and Div. 6- Non-Structural Rough Carpentry, - Div. 6 - Finish Carpentry (MDO & FRP) Div. 6 - Rough Carpentry Material Package, Div. 9 - Protection of finishes and Div. 10 - Install Accessories and will do so as a competitive bid QUESTION DEADLINE: Thursday, September 18, 2025, at 5PM Please email all questions to Sean Samples at sean.samples@pence.net. The Owner's Target GMP Range is: Approximately $ 73.4 Million
Post-Bid
Educational
$73,400,000.00
Public - City
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
November 24, 2025
318 Leroy Ave, Molalla, OR
Related To This Project
Molalla, OR
Bid Date: Nov 26 2025
Molalla, OR
Bid Date: Nov 26 2025
Molalla, OR
Bid Date: Jan 30 2026
Molalla, OR
Bid Date: Aug 07 2025
Molalla, OR
--
Molalla, OR
Bid Date: Mar 05 2025
Molalla, OR
Bid Date: Mar 19 2025
Molalla, OR
Bid Date: Feb 12 2025
Molalla, OR
Bid Date: Jan 08 2025
Molalla, OR
Bid Date: Dec 11 2024
Molalla, OR
Bid Date: Jul 23 2024
Molalla, OR
Bid Date: Jul 03 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
